ultrascale学习笔记之启动时序分析

基于MPSOC上电启动电源分析

Technical Reference Manual

(内部版本)


1.版本说明

DataAuthorVersion Revision
2021/01/18chengyang1.0 初定版本
2021/01/22chengyang1.2 完善时序

2.概要

主要针对MPSOC硬件进行分析设计。

  • 参考黑金ZU3CG开发板
  • 参考 ds925-zynq-ultrascale-plus:DC and AC Switching Characteristics.pdf
  • 参考 ug1075-Zynq UltraScale+ Device Packaging and Pinouts Product Specification.pdf

3.分析

整个启动顺序分为PS和PL,两部分完全独立;
PS分为两步:
第一:The low-power domain (LPD)
第二:The full-power domain (FPD)
PS与PL完全独立,并行。

3.1.PS-LPD启动顺序

>  To achieve minimum current draw and ensure that the I/Os are 3-stated at power-on, the recommended power
>  on sequence for the low-power domain (LPD) is listed. The recommended power-off sequence is the reverse of

>  the power-on sequence.

>  1. VCC_PSINTLP

>  2. VCC_PSAUX, VCC_PSADC, and VCC_PSPLL in any order or simultaneously.

>  3. VCCO_PSIO

  • 以 4CG为例:
LPD
启动顺序123
电压名称VCC_PSINTLPVCC_PSAUX/VCC_PSADCVCC_PSPLL
VCCO_PSIO0_500/ VCCO_PSIO1_501/ VCCO_PSIO2_502/ VCCO_PSIO3_503
电压值0.85v1.8v1.2v1.8v

3.2.PS-FPD启动顺序

>  To achieve minimum current draw and ensure that the I/Os are 3-stated at power-on, the recommended power
>  on sequence for the full-power domain (FPD) is listed. The recommended power-off sequence is the reverse of

>  the power-on sequence.

>  1. VCC_PSINTFP and VCC_PSINTFP_DDR driven from the same supply source.

>  2. VPS_MGTRAVCC and VCC_PSDDR_PLL in any order or simultaneously.

>  3. VPS_MGTRAVTT and VCCO_PSDDR in any order or simultaneously.
  • 以 4CG为例:
FPD
启动顺序456
电压名称VCC_PSINTFP/VCC_PSINTFP_DDRPS_MGTRAVCCVCC_PSDDR_PLLPS_MGTRAVTTVCCO_PSDDR
电压值0.85v0.85v1.8v1.8v1.2v

3.3.PL启动顺序

>  The recommended power-on sequence is VCCINT, VCCINT_IO/VCCBRAM/VCCINT_VCU, VCCAUX/VCCAUX_IO, and VCCO

>  to achieve minimum current draw and ensure that the I/Os are 3-stated at power-on. The recommended power
>  off sequence is the reverse of the power-on sequence. If VCCINT and VCCINT_IO/VCCBRAM have the same

>  recommended voltage levels, they can be powered by the same supply and ramped simultaneously. VCCINT_IO

>  must be connected to VCCBRAM. If VCCAUX/VCCAUX_IO and VCCO have the same recommended voltage levels,

>  they can be powered by the same supply and ramped simultaneously. VCCAUX and VCCAUX_IO must be connected

>  together. VCCADC and VREF can be powered at any time and have no power-up sequencing requirements.


>  The recommended power-on sequence to achieve minimum current draw for the GTH or GTY transceivers is

>  VCCINT, VMGTAVCC, VMGTAVTT OR VMGTAVCC, VCCINT, VMGTAVTT. There is no recommended sequencing for

>  VMGTVCCAUX. Both VMGTAVCC and VCCINT can be ramped simultaneously. The recommended power-off sequence

>  is the reverse of the power-on sequence to achieve minimum current draw. If these recommended sequences

>  are not met, current drawn from VMGTAVTT can be higher than specifications during power-up and power-down.
  • 总结上述文档:

  • PL-逻辑

  • VCCINT 和 VCCINT_IO 和 VCCBRAM 由同一组电源供电(0.85v)

  • VCCAUX 和 VCCAUX_IO 由同一组电源供电(1.8v)* VCCADC 和 VREF没有上电顺序要求;

  • PL-MGT

  • VCCINT(0.85v) 和 MGTAVCC(0.9v)

  • MGTAVTT(1.2v)

  • MGTVCCAUX(1.8v)没有启动要求

  • 以 4CG为例:

启动顺序12
电压名称VCCINT/VCCINT_IO /VCCBRAM VCCAUX/VCCAUX_IO 
电压值0.85v1.8v
启动顺序12
电压名称VCCINTMGTAVCCMGTAVTT
电压值0.85v0.9v1.2v

3.疑问

  • ·· VCCO 的启动顺序 ? ··
    答案:最后启动

4.预定功能IO

PS_POR_B : LPD启动完成后拉高
PS_PROG_B :LPD启动完成后拉高
PS_SRST_B : LPD启动完成后拉高

在这里插入图片描述

S_SRST_B : LPD启动完成后拉高

在这里插入图片描述

  • 3
    点赞
  • 8
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值