上饶市MedAccred _AC8121电子电缆和线束组件的审核标准 (47)

25.11 C- Is the setup of soldering equipment being carried out in accordance with procedures?YES/NO

25.12 C- Is the procedure for soldering being followed?YES/NO

25.13 C- Is the process that defines the acceptance criteria of soldered connections available and being followed?YES/NO

25.14C- Are solder and flux used within the required shelf-life?YES/NO

25.15 C- Are solder joints inspected with the required magnification?YES/NO

25.16 C- Are the soldering tools set to the specified temperature for the solder alloy being used and are there controls in place that prevent the operator from arbitrarily adjusting the soldering iron tip temperature beyond the allowable adjustment?YES/NO

25.17 C- Is the wire tinned in accordance with the procedure prior to soldering?YES/NO/NA

25.18 C- Is cross contamination between different solder alloys being prevented?YES/NO

25.19 C- Is cross contamination between different fluxes being prevented?YES/NO

25.20 C- Is there evidence that cleanliness requirements for soldered connections are being followed?YES/NO

25.21C- If required, are soldered joints with shrink sleeve requirements inspected following shrinking for reflow of solder, or other damage to the area?YES/NO/NA

25.22 C- If required, are soldered joints with shrink sleeve requirements cleaned before the sleeving is shrunk?YES/NO/NA

25.23 C- If no-clean flux is required, are no-clean fluxes used, and the joints soldered with it inspected as per procedures?YES/NO/NA

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值