SAB: PP - 3 BOM, Work Center & Routing

46 篇文章 0 订阅
38 篇文章 2 订阅

CONFIGURATION DOCUMENTATION

 

Topic:BOM,WorkCenter & Routing

 

 

Name

Target Completion Date

Actual Completion Date

StatusO/I/C*

Config. template prepared by

 

14/01/2013

14/01/2013

C

Knowledge transfer to

 

 

 

 

Actual set up by

 

14/01/2013

14/01/2013

C

Reviewed by

 

 

 

 

 

*Status: O – Outstanding, I – In Progress, C – Completed

 

Transport request no.

 

Client Dependent/Independent

 Client Dependent

 

I. Objective

 

-         Set up Production related basic data

 

II. Configuration Template

 

Step 1.1: Define BOM Default Values

 

Step 1.1

Goto t-code OS28

IMG Menu

Production > Basic Data > Bill of Material > Control Data for Bills of Material > Define Default Values

Prerequisite

 

 

Default base quantity: 1

Default BOM status: 1

 


Step 1.2Define BOM Usage

 

Step 1.2

Goto t-code OS20

IMG Menu

Production > Basic Data > Bill of Material > General Data > BOM Usage > Define BOM Usage

Prerequisite

 

 

Defined BOM Usage:

1 – Production

R – Rework / Repair


Step 1.3Define Default Values for the Item Status

 

Step 1.3

Goto t-code OS21

IMG Menu

Production > Basic Data > Bill of Material > General Data > BOM Usage > Define Default Values for the Item Status

Prerequisite

 

 

Defined Usage 1

 


Step 1.3Define Material Types Allowed in BOM Header

 

Step 1.3

Goto t-code OS24

IMG Menu

Production > Basic Data > Bill of Material > General Data > Define Material Types Allowed for BOM Header

Prerequisite

Material Type defined

 

Define * for Material Type under BOM usage 1 is allowed as header material


Step 1.4: Define BOM Statuses

 

Step 1.4

Goto t-code OS23

IMG Menu

Production > Basic Data > General Data > Define BOM Status

Prerequisite

 

 

 

Check no functionality for BOM Status 1

Check all functionalities for BOM Status 2
Step 1.5: Configure History Requirement for BOMs

 

Step 1.5

Goto t-code OS25

IMG Menu

Production > Basic Data > General Data > Configure History Requirement for BOMs

Prerequisite

BOM Status defined

 

Check “History requirement” for BOM Usage 1, BOM Status 2


Step 1.6: Define Allowed Material Types for BOM Items

 

Step 1.6

Goto t-code OS14

IMG Menu

Production > Basic Data > Item Data > Define Allowed Material Types for BOM Items

Prerequisite

Material types defined

 

 

Indicator “+” as allowed combination between header material type and BOM item material type and the BOM Usage indicator
Step 1.7: Define Order of Priority for BOM Usages

 

Step 1.7

Goto t-code OS31

IMG Menu

Production > Basic Data > Alternative Determination > Define Order of Priority for BOM Usages

Prerequisite

 

 

 


Step 1.8: Define Applications

 

Step 1.8

Goto t-code OS30

IMG Menu

Production > Basic Data > Item Data > Define Applications

Prerequisite

 

 

Check application PP01 with selection ID “01” check box “ExpMRP”, “PlndOr”, “RelCstg”, “RelWKSch”, “RelOrdr.” for production use

Check application PP99 with selection ID “Z1” and do NOT check any box for rework use


Step 1.9: Define Alternative Determination for Production

 

Step 1.9

Goto t-code SPRO

IMG Menu

Production > Basic Data > Bill of Material > Alternative Determination in Related Application Areas > Define Alternative Determination for Production

Prerequisite

Production Order Type defined

 

Define Order type “PPX1” to use application “PP01”

Define Order type “PPX2”, “PPX3” to use application “PP99”


Step 2.0: Define Alternative Determination for MRP

 

Step 2.0

Goto t-code SPRO

IMG Menu

Production > Basic Data > Bill of Material > Alternative Determination in Related Application Areas > Define Alternative Determination for MRP

Prerequisite

 

 

All plant use selection ID: 01


Step 2.1: Define Parameters - Standard Value (for Workcenter)

 

Step 2.1

Goto t-code OP7B

IMG Menu

Production > Basic Data >WorkCenter > General Data > Standard Value > Define parameters

Prerequisite

 

 

 

 


Step 2.2: Define standard value key - Standard Value (for Workcenter)

 

Step 2.2

Goto t-code OP19

IMG Menu

Production > Basic Data >WorkCenter > General Data > Standard Value > Define standard value key

Prerequisite

 

 

 

 


Step 2.3: Define person responsible

 

Step 2.3

Goto t-code SPRO

IMG Menu

Production > Basic Data >WorkCenter > General Data > Define person responsible

Prerequisite

Plant defined

 

 


Step 2.4: Define Control Keys for Operations

 

Step 2.4

Goto t-code OP00

IMG Menu

Production > Basic Data >WorkCenter > Routing Data > Define control key

Prerequisite

 

 

 

 


Step 2.5: Define Capacity Planner

 

Step 2.5

Goto t-code SPRO

IMG Menu

Production > Basic Data >WorkCenter > Capacity Planning > Define capacity planners

Prerequisite

 

 

 


Step 2.6: Define Material Type Assignments (Routing)

 

Step 2.6

Goto t-code OP50

IMG Menu

Production > Basic Data > Routing > General Data > Define Material Type Assignments

Prerequisite

Material Types defined

 

 


Step 2.7: Define Routing Statuses

 

Step 2.7

Goto t-code OP46

IMG Menu

Production > Basic Data > Routing Data > General Data > Define Routing Statuses

Prerequisite

 

 

 


Step 2.8: Define Routing Selection Automatically

 

Step 2.8

Goto t-code OPEB

IMG Menu

Production > Basic Data > Routing > Routing Selection > Select Automatically

Prerequisite

 

 

 

 

 

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值