SAP:PP - 4 Capacity Requirement

46 篇文章 0 订阅
38 篇文章 2 订阅

CONFIGURATION DOCUMENTATION

 

Topic:Capacity Requirements Planning

 

 

Name

Target Completion Date

Actual Completion Date

StatusO/I/C*

Config. template prepared by

 

14/01/2013

14/01/2013

C

Knowledge transfer to

 

 

 

 

Actual set up by

 

14/01/2013

14/01/2013

C

Reviewed by

 

 

 

 

 

*Status: O – Outstanding, I – In Progress, C – Completed

 

Transport request no.

 

Client Dependent/Independent

 Client Dependent

 

I. Objective

 

-         Set up Capacity Requirement Planning

 

II. Configuration Template

 


Step 1.1: Define Scheduling Type

 

Step 1.1

Goto t-code OPJN

IMG Menu

Production > Capacity Requirements Planning > Operations > Scheduling > Specify scheduling type

Prerequisite

 


Step 1.2: Define Scheduling Parameters for Production Orders

 

Step 1.2

Goto t-code OPU3

IMG Menu

Production > Capacity Requirements Planning > Operations > Scheduling > Define Scheduling Parameters for Production Orders

Prerequisite

Plant defined, Production order type defined

 

 


Step 1.3: Define Scheduling parameters for planned orders

 

Step 1.3

Goto t-code OPU5

IMG Menu

Production > Capacity Requirements Planning > Operations > Scheduling > Define Scheduling Parameters for planned orders

Prerequisite

Plant defined

 

 

  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值