CONFIGURATION DOCUMENTATION
Topic: Logistics - General
|
Name |
Target Completion Date |
Actual Completion Date |
Status O/I/C* |
Config. template prepared by |
|
28/01/2013 |
28/01/2013 |
C |
*Status: O – Outstanding, I – In Progress, C – Completed
I. Objective
- Set up Logistics - General
II. Configuration Template
Step 1.1: Assign Fields to Field Selection Groups
Step 1.1 |
Goto t-code SPRO |