Test lifecycle -- important chapter in test plan

 Some engineerings will write functional/nonfunctional test cases in test plan which occupys majority of pages. But some more important things are missed.One is test lifecycle. 
       Test plan should be writed according to project plan. Test lifecycel defination derives from lifecycle in project plan.Lifecycle impacts test work much. To achieve enough test is always big problem. If we don't care project lifecycle, how do we know what should be tested first, what is the most important components? We will spend more efforts in somewhere than plan.So in test lifecycle,some issue below should be care:
 1, how to plan test stages?
 For example, Does project select waterfall lifecycle? So test team select V lifecycle.
 Dose project select prototype lifecycle? if Yes, How do test team test the prototype?
 and other lifecycles? for example, spire or some one self defined.

 2, Which test strategys will be selected for each stages?
 For example, How do test team review the SRS? Peer review in test team first, then attend the review meeting with Developers? or assign one tester to review it, and submit issues to developers.
 To the High level design and detail design, what should test team do? Let it be or attend their review meeting or review it independly? 
 How to test the functionality after the software can run? Shall the manager of test team drive tester to repeat the test cases? or develop automation test to run some test cases?
 How to test the non-functionality? what about the performance/stress?
 reliablity? and so on.

 3, How is some special tests arranged?
 For functionality, Which components should be tested firstly? when? 
Some components are very important. Developer write them first before SRS is completed. So how to test them? Should test team test them by special methods according to the interface of these components? or let them be till developer integrate them into a big chunk?
 For non-functionality, What should be done firstly? when?
 Commonly, performance is hardly optimized after the all software is completed. So performance test should be carried out at the first time.

  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值