执行CK44,会删除如下数据:
If you _deletea costing run, the data for
|
|
Selection
|
is deleted
|
Structure explosion
|
is deleted
|
Cost estimate
|
is not deleted
|
Marking
|
is not deleted
|
Release
|
is not deleted
|
The administrative data for the costing run (name, description, selection and structure explosion) is deleted. The material cost estimates themselves are not deleted. You have to _deletethem in a second step CKR1.
执行CKR1,会删除如下数据:
When you _deletea material cost estimate, the following data is deleted:</