If you use the actual costing (material ledger), you must have
completely closed all period-end closing operations in the
actual costing for the penultimate period prior to the period
shift. Use the 'Costing Cockpit' (Transaction CKMLCP) to make
sure that all the materials of the run have status 'Closing
entry performed'.
The processing of older periods is not supported in the standard
system. Particularly in test systems, however, sometimes the
period has been shifted once without all of the period-end
closing operations of the penultimate period having been
successfully carried out beforehand.
You can still carry out period-end closing operations in the
previous periods using the following workaround.
Single-level price determination:
==> Call up Transaction CKMLCP.
==> Select the costing run and the period for which you want to
carry out the period
SAP 物料账前期没有运行的解决方法
最新推荐文章于 2021-06-10 08:54:30 发布