SAP WM RF Monitor - TO Priority
In LRF1 system automatically determines the priority based on the age of the TO. We cannot edit it.
But we can drag and drop the TO at different places in the queue with the help of the mouse. Then the priority of the TO gets changed to a lower or higher value as per its position in the queue.
One of the places where we can define priority in WM is on transfer requirement priority at movement level under define movement types.
I haven't seen any other place where we can assign or change priority.
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29829936/viewspace-1813740/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/29829936/viewspace-1813740/