The correct procedure is below:

  • Create Process Order and Release the Process Order.

  • Before Re-reading the master data, click on the Material List button.  Click in the requirement quantity column, then put 0 in each requirement quantity.  Then, save the process order.

  • Open the Process order in change mode (COR2).  Then, re-read the master data.  It will put the process order back at the “CRTD” status.  It will also update the transfer requirements appropriately automatically.  No additional manual steps to delete TRs using LB02 will be required with this process.

 

 

After testing, for the pick parts, we found that:

  1. We can re-read process order when TR is open (no subsequent TO document).

  2. We cannot re-read process order once TO document created, no matter if TO was confirmed/cancelled. Even if I cancelled TO and deleted TR document, the process order still cannot be re-read.

  3. This is due to the system design. When you delete transfer requirements, the transfer requirement quantity is not reset in the related reservations. You will have error message C2 135 while doing read PP master data. We can refer OSS note   1642564 - Open transfer requirement prevents re-read of master data. Use the program ZPSFC243B to transfer requirement quantities to reservation.

 

 

2017-02-04 写于苏州市吴中区

 

 

 

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29829936/viewspace-2133056/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/29829936/viewspace-2133056/

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值