【Planning】R3 Ref. and Pooled Capacity

Purpose:

在项目上遇到一个resource上的capacity无法修改,最后弄明白是Pooled capacity。在R3里capacity可以直接使用CA11或者在workcenter/resource中进行定义;

Pooled capacity主要应用于像同样的人员/机器适用在不同的work center/resource里;它一般是有constraint的;

reference capacity:主要应用于比如不同的work center/resource中的人员、机器等具有相似的capacity,例如start/end时间、utilization、capacity (如Hour)等。


Content:

Create reference capacity

CR11:

Machine generated alternative text:
Create Capacity: Header
7 Intervals and Shifts 6? Intervals 慉vailable Capacity Profile 6? Reference Available Capacity 6? Short Texts APO Resource
Plant 4870 WORMS PLANT-ENTREPRENEUR
Capacity ZED_TES3 ?dSon reference capacity in iplanningi
Capacity category 0011 Machine
General data
Capacity planner grp Capacity Planner 1
Pooled capacity Grouping
Available capacity
Factory calendar ID XY1 GREM factory calendar 5 WD
Actwe version Normal available capacity
Base unit of meas. E Hour
Standard available capacity ____________
Start [&i:oo:ool
Finish 18:00:00 Capacity utdization 90
Length of breaks 02:00:001 No. of mdiv. cap.
Operating time 7.20 Capacity 7.20
Planning details
i Relevant to finite scheduling Overload
RiCan be used by several operations Ri Long-term planning


Create pooled capacity

CR11:

Machine generated alternative text:
Create Capacity: Header
? Intervals and Shifts 42 Intervals &慉vailable Capacity Profile 42 Reference Available Capacity 42
Plant 4870 WORMS PLANT-ENTREPRENEUR
Capacity ZEDTES4 edison pooled capacity in iplanning
Capacity category Labor
General data
Capacity planner grp Capacity Planner 1
RiPooled capacity Grouping
Available capacity ________
Factory calendar ID 蚷?1 GREM factory calendar 5 WD
Active version 71 Normal available capacity
Base unit of meas. Hour
Standard available capacity ___________
Start o8:oo:Oof
Finish ie:oo:oo? Capacity utdization
Length of breaks 101:00:001 No. of mdiv. cap.
Operating time 9.00 Capacity 54.00
Planning details
j Relevant to finite scheduling Overload
]Can be used by several operations ? R Long-term planning


 


Create work center/resource

CRC1:

Machine generated alternative text:
Create Resource: Basic Data
I1 lTemplate
Plant 4870 WORMS PLANT-ENTREPRENEUR
Resource ZED_TES3 ed歰n test resource 3 in iplanning
Basic Data Default Values Capacities Scheduling Costing
General Data
Resource category rajoil Machine
Person responsible i1 Resource Responsible
Location
QDR system
Supply Area
Usage All task list types
Backflush
Standard Value Maintenance
Standard value key ZED1 rEdson case for iplaning
Standard Values Overview
Key Word Rule for Maint. K... De.ion
Setup for collection no checking
Setup for Tidy up no checking
Machine no checking
Labor no checking
a
I  I

Machine generated alternative text:
Create Resource: Default Values
SSHRMS Hierarchy Template
Plant 4870 WORMS PLANT-ENTREPRENEUR
Resource ZEDTES3 edison test resource 3iniplannh,g
Basic Data Default Values Capacities Scheduhng Costing
Operation Default Values
Control key rPIOij]ji flRef. md. Process manufacturing
Standard text key f[]Ref. md.
Suitabdity flRef. md.
Setup Type Key J flRef. md.
Wage Type ?  EJ Ref. md.
Wage group J [] Ref. md.
No. of Time Tickets  [] Ref. md.
No. confirm. slips fl EJRef. md. Printer
Units of Measurement of Standard Values
Parameter S... Unit Name
Setup for collection MIN Minute
Setup for Tidy up MIN Minute
Machine MIN Minute
Labor H Hour
a
w.
4


Add reference capacity

Machine generated alternative text:
L? gesource dit oto [_trJ System Help
[ 5hnrt tt-c 莌ifr4-F7 fl  ( (i
Maintain Reference Availability Capacity Shift+F4
Create Resource C vaii cap via nier.
Units of measure
6? Intervals and Shifts 6? I lable Capacity 6? Short Texts APO Resc
Reset capacity
Plant 47O] WORMS PLANT-ENTREPRENEUR
Resource ZED_TES3? edison test resource 3 in iplanning
Capacity category 0011
General data
Capacity planner grp PLi
Grouping
Available capacity
Factory calendar ID
Active version
Base unit of meas.

Machine generated alternative text:
Ec? Reference Available Capacity
Plant
Capacity ZED_TES3
Capacity category
Select work center capacity 
Work center ZED_TESi1
Capacity category


Machine generated alternative text:
Create Resource Capacity: Header
6? Intervals and Shifts 6? Intervals 6龗 Available Capacity Profile 6? Reference Available Capacity
Plant 4870 WORMS PLANT-ENTREPRENEUR
Resource ZED_TE531 edison test resource 3 in iplanning
Capacity category oi1 1
General data
Capacity planner grp Capacity Planner 1
Grouping
Available capacity
Factory calendar ID
Active version 1 NormaI available capacity
Base unit of meas. H Hour
Standard available capacity
Start 08:00:00
Finish 18:00:00 Capacity utdization 90
Length of breaks 02:00:0& No. of mdiv. cap.
Operating time 7.20 Capacity 7.20 H
Planning details
Relevant to finite scheduling Overload
Can be used by several ooerations I] Lona-term Dlannina

==> capacity detail正是被refered的capacity


Add pooled capacity

Machine generated alternative text:
tnt. aist. Key
Capacity category Labor
edison pooled capad
Prod: Setup rqmts
Prod.: Labor rqmts
Control CapacityReduction
[o Formula-Related
[o Formula-Related
ri Formula-Related
 Formula i Formuia constnts ActcapReqmnts
ZED_TES4
SAPO 05 1
SAPO 07
Pooled opacity
Setup formula
Processing formula
Teardown formuL
Other formula
Distribution
mt. dist.

Machine generated alternative text:
Display Resource Capacity: Header
6? Intervals and Shifts ? Intervals pAvailable Capacity Profile ? Reference Available Capacity
Plant 4870 WORMS PLANT-ENTREPRENEUR
Resource ZED_TES3 edison test resource 3 in iplanning
Capacity category 0021 ZED_7E54 edison pooled capacity in ?lanning
Genera? data
Capacity planner grp Capacity Planner 1
. Grouping
Available capacity
Factory calendar ID XY GREM factory calendar 5 WD
Active version 1 Normal available capacity
Base unit of meas. E Hour
Standard available capacity
Start 08:00:00
Finish 18:00:00 Capacity utdization 100
Length olbreak5 01:00:00 No. of mdiv. cap. 6
Operating time 9.00 Capacity 54.00
Planning details
Overload O %

==> Pooled capacity是only display


来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/17144169/viewspace-2131662/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/17144169/viewspace-2131662/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
毕业设计,基于SpringBoot+Vue+MySQL开发的纺织品企业财务管理系统,源码+数据库+毕业论文+视频演示 在如今社会上,关于信息上面的处理,没有任何一个企业或者个人会忽视,如何让信息急速传递,并且归档储存查询,采用之前的纸张记录模式已经不符合当前使用要求了。所以,对纺织品企业财务信息管理的提升,也为了对纺织品企业财务信息进行更好的维护,纺织品企业财务管理系统的出现就变得水到渠成不可缺少。通过对纺织品企业财务管理系统的开发,不仅仅可以学以致用,让学到的知识变成成果出现,也强化了知识记忆,扩大了知识储备,是提升自我的一种很好的方法。通过具体的开发,对整个软件开发的过程熟练掌握,不论是前期的设计,还是后续的编码测试,都有了很深刻的认知。 纺织品企业财务管理系统通过MySQL数据库与Spring Boot框架进行开发,纺织品企业财务管理系统能够实现对财务人员,员工,收费信息,支出信息,薪资信息,留言信息,报销信息等信息的管理。 通过纺织品企业财务管理系统对相关信息的处理,让信息处理变的更加的系统,更加的规范,这是一个必然的结果。已经处理好的信息,不管是用来查找,还是分析,在效率上都会成倍的提高,让计算机变得更加符合生产需要,变成人们不可缺少的一种信息处理工具,实现了绿色办公,节省社会资源,为环境保护也做了力所能及的贡献。 关键字:纺织品企业财务管理系统,薪资信息,报销信息;SpringBoot
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值