Creating a Connection Between Selected Actions

Prerequisites
You have opened a Process Integration scenario. The Process Integration Scenario contains at least two actions.
There are three different situations where you require a connection between two actions. Each situation requires you to implement a particular connection type:
● To connect two subsequent actions within the same application component, you must define a sequence connection.
● To connect two actions from different application components that communicate with each other synchronously, you must define a synchronous connection. Both actions must be on the same level in the Process Integration Scenario graphic.
● To connect two actions from different application components that communicate with each other asynchronously, you must define an asynchronous connection. The target action must be on a lower level than the source action in the Business Scenario graphic.
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值