Phase activities definition for the whole software lifecycle

1.Concept phase (For BD and presale staff)

ü Concept definition
2. Plan phase
ü WBS   generation
ü Project scale assessment (Code lines[function points] and time cost in work days)
ü Staff scale assesment
ü Document ation target customization (Preliminary target/detail target/deploy target)  (Structure chart*****)
ü Quality assurance procedure & target (review ticket desity, test case density in UT/CT etc.)
ü Risk analysis
ü Configuration plan (Baseline, structure, ******)
ü Training plan & communication plan (Training plan, when, who, where, what******)
ü Progress & Execution monitoring  procedure (*****)
ü Check in procedure, review procedure
3. Requirement phase
ü Requirement capture(Requirement log document)
ü Requirement integration & analysis
ü Requirement review & confirm (*******)
ü Requirement change procedure & standing book (******)
4. Preliminary design phase
ü Architect design
ü Use case design
ü Main data flow design
ü Module & interface design
ü UI design
ü DB design
ü Design review
5. Detail design phase
ü Algorithm design
ü Module implementation design
ü CCL design
ü Design review
6. Coding phase
ü Coding
ü Code review
ü UT
ü Coding statistics
7. Build phase
ü Baseline record  and version tag set before a building.
ü Building & log record, interal build version control and delivery for internal test.
8. CT/ST/UAT phase
ü CT/ST/UAT
ü BUG ticket
ü BUG fix
ü BUG  generation & consumption trend, trace, analysis, report
9. Release phase
ü Binary build & release
ü Document release (check out from version control tool) (*****)
ü Release audit (Quality target reach or not check, integraty check for the documentation and code version) (***)
ü Release notes
10. Deploy phase
ü Deploy plan (*****)
ü Installation package make & test (Quality assurance reference the previous coding phase & test phase) (*****)
ü Deploy manual (*****)
11. Maintenance phase
ü Maintenance issue ticket generation
ü Maintenance issue  fix,  time cost,regression test.
12. Summary phase
ü Each phase's estimate and its real execution result.
ü Requirement change quantity and time cost for these changes.
ü Quality assurance plan and its analysis, related reasons analysis, digest analysis and quality conclusion.
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值