Agile Methodologies & Scrum Framework

Scrum is one of the frameworks following the guideline of agile methodologies.

In Scrum, iteration is equal to sprint.

An epic story can be defined as a large undefined user story that needs to be broken down in smaller pieces before it can be used.

Product backlogs are related to the tasks to be done for the overall product.

Sprint backlogs are the ones that need to be completed in the current sprint.

A user story- simply put, is a way to define a software feature from an end-user perspective, note the emphasis.

Another aspect related to user stories are the user story points. These points are a way to estimate the task size.


Four kinds of meetings: morning stand-up meeting, planning meeting, review meeting and retrospective  meeting.Retrospective meeting is a meeting talking about things we didn't do well and how to improve while the review meeting is just for a review of the tasks already done.


Use a parking lot. There are legitimate things for a team to talk about in the morning that don’t fit the tightly-defined purpose of the Daily Scrum. Use a parking lot (i.e. a flip chart or section of a whiteboard) to capture those topics. Address them right after the Daily Scrum is over. You can even let team members add items to the parking lot outside of the meeting to be addressed in the next “parking lot time.” That way, they’re not trying to remember their parking lot topic when they should be paying attention to the Daily Scrum.

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值