SAP MRP4 view -- individual / collective requirements的理解

本文详细介绍了物料主数据、物料需求计划(MRP)及物料清单(BOM)在制造订单类型(MTO)策略下的采购流程。解释了个体与集体需求指示符的应用,强调了集体采购适用于MTS材料,并举例说明了如何根据不同策略(如40)确定组件的采购方式。此外,文章还讨论了在不同的计划策略下,如何通过MaketoStock计划确保组件按需求单独或集体生产。

摘要生成于 C知道 ,由 DeepSeek-R1 满血版支持, 前往体验 >

1.  Material Master --- > MRP4 -----> BOM explosion/dependent requirements ---- > individual / collective requirements

 

 

 

Individual collective indicator is only for MTO strategies.

 

Where in the procurement happens account assigned to Sales Order.

If you want to individually procure or collectively procure the components is based on the selection on 1 or 2.

 

For MTS Materials all the dependent requirements will be procured collectively.

In your case Planning stragey for A and B is 40, so the dependent material Z will be procured collectively only.

 

Make to Stock -Planning here dependent requirement of the header material will be group together as per the requirement same date .It will not follow up the Individual or Collective requirement Indicator which is only applicable for MTO materials.

 

What is the planning strategy you are using?

I hope you are doing MTO for Fert Material.

If u want raw material to be produced for with collective,

set the collective/ind = 2 for raw material alone at MRP4 view.

 

Run the MRP again with planning mode - 3 for FERT.

Also note If u want to system produce one procurement proposal for all two dep requiremnenst, set lot size as MB for components and try. is it what u required.collective requirement means component will produced for several requirements seperately, not for collective of all depent requirements if u set EX lot size.

转载于:https://www.cnblogs.com/jefflu2012/p/3994231.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值