SAP MRP4 view -- individual / collective requirements的理解

1.  Material Master --- > MRP4 -----> BOM explosion/dependent requirements ---- > individual / collective requirements

 

 

 

Individual collective indicator is only for MTO strategies.

 

Where in the procurement happens account assigned to Sales Order.

If you want to individually procure or collectively procure the components is based on the selection on 1 or 2.

 

For MTS Materials all the dependent requirements will be procured collectively.

In your case Planning stragey for A and B is 40, so the dependent material Z will be procured collectively only.

 

Make to Stock -Planning here dependent requirement of the header material will be group together as per the requirement same date .It will not follow up the Individual or Collective requirement Indicator which is only applicable for MTO materials.

 

What is the planning strategy you are using?

I hope you are doing MTO for Fert Material.

If u want raw material to be produced for with collective,

set the collective/ind = 2 for raw material alone at MRP4 view.

 

Run the MRP again with planning mode - 3 for FERT.

Also note If u want to system produce one procurement proposal for all two dep requiremnenst, set lot size as MB for components and try. is it what u required.collective requirement means component will produced for several requirements seperately, not for collective of all depent requirements if u set EX lot size.

转载于:https://www.cnblogs.com/jefflu2012/p/3994231.html

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值