MD01-对工厂级别的所有物料进行MRP运行
MD02-对单个物料进行MRP运行
MD04-显示MRP运行后的库存和需求
MD02-MRP自动产生计划订单
MD11-手工创建计划订单
MD12-修改计划订单
MD13-显示计划订单(个别)
MD16-按照条件显示(集中)
计划订单转成生产订单的方式:
CP40-单个转化
CO48-部分转化
CO41-集中转化
Transaction Codes for MRP (PP-MRP)
Menu Nodes | Transaction | Activity |
Master Data | MD25 | Create planning calendar |
MD26 | Change planning calendar | |
MD27 | Display planning calendar | |
MDSA | Display BOM explosion number | |
MDSP | Edit BOM explosion number | |
MEQ1 | Maintain quota file | |
OPPP | Explode BOM by date | |
MDUS | Display project assignment | |
MDUP | Process project assignment | |
MDL1 | Create production lot | |
MDL2 | Change production lot | |
MDL3 | Display production lot | |
Planning | MD20 | Create planning file entry |
MD21 | Display planning file entry | |
MDAB | Set up planning file entry in background | |
MDRE | Check planning file entry | |
MD01 | Total planning online | |
MDBT | Total planning in background | |
MD03 | Single-item, single-level planning | |
MD02 | Single-item, multi-level planning | |
MD43 | Interactive single-item planning | |
MD50 | Multi-level, make-to-order planning | |
MD51 | Multi-level project planning | |
MF52 | Display planning table | |
MF50 | Change planning table | |
MF57 | Planning table by MRP lists | |
MF51 | Planning table by production list | |
Evaluations | MD04 | Stock/requirements list |
MD07 | Collective access of stock/requirements lists | |
MD05 | MRP list | |
MD06 | Collective access of MRP lists | |
MDLD | Print MRP list | |
MD45 | Planning result | |
MD46 | Collective access of planning result | |
MD44 | Planning situation for a material | |
MD47 | Planning situation for a product group | |
MD48 | Cross-plant planning situation | |
MD4C | Order report | |
MD09 | Pegged requirements | |
CO46 | Order progress | |
Planned Order | MD11 | Create planned order |
MD12 | Change planned order | |
MD13 | Individual access of planned order | |
MD16 | Collective access of planned orders | |
MD14 | Individual conversion of planned order into purchase requisition | |
MD15 | Collective conversion of planned orders into purchase requisitions | |
MDUM | Convert planned order into purchase requisition in background | |
CO40 | Convert individual planned order into production order | |
CO41 | Collective conversion of planned orders into production orders | |
CO48 | Partial conversion of planned order into production order | |
COR7 | Individual conversion of planned order into process order | |
COR7_PC | Collective conversion of planned orders into process orders | |
COR8 | Partial conversion of planned order into process order | |
MDVP | Collective availability check | |
MDAC | Execute action for planned order |
Tables for MRP (PP-MRP)
# | TABLE | Description | Application | Table Type |
---|---|---|---|---|
1 | MRP_CONTROLLER | mrp Controller Detail | PP - Planning Evaluation | Structure |
2 | MDTB | mrp Table | PP - Master Data | Transparent Table |
3 | MDKP | Header Data for mrp Document | PP - Master Data | Transparent Table |
4 | MDMA | mrp Area for Material | PP - Master Data | Transparent Table |
5 | MDVM | Entry in mrp File | PP - Master Data | Transparent Table |
6 | DBVM | Planning File Entry, mrp Area | PP - Master Data | Transparent Table |
7 | MDTC | Aggregated mrp table items | PP - Master Data | Transparent Table |
8 | MARC | Plant Data for Material | Logistics - Material Master | Transparent Table |
9 | EBAN | Purchase Requisition | MM - Purchasing | Transparent Table |
10 | PLAF | Planned order | PP - Master Data | Transparent Table |
11 | MARD | Storage Location Data for Material | Logistics - Material Master | Transparent Table |
12 | MDVP | Corrected requirements | PP - Master Data | Structure |
13 | RESB | Reservation/dependent requirements | MM - Inventory Management | Transparent Table |
14 | MDSP | View of BOM items and material master for gross reqmts plng | PP - Master Data | Structure |
15 | MDUP | Generierte Tabelle zu einem View | PP - Master Data | General View Structure |
16 | MDSA | Generierte Tabelle zu einem View | PP - Master Data | General View Structure |
17 | MDAS | Structure for Exception Statistics - mrp | PP - Master Data | Structure |
18 | T024D | mrp controllers | PP - Master Data | Transparent Table |
19 | VERT | Distribution for mrp elements | PP - Master Data | Structure |
20 | MT61D | Material Master: mrp | LO - Material Master | Structure |
21 | S194 | mrp: Business Info Warehouse | Logistics - Data Collection | Transparent Table |
22 | PBID | Planned independent requirements index: mrp area | PP - Demand Management | Transparent Table |
23 | MDEZ | Individual lines of the mrp elements | PP - Master Data | Structure |
24 | T399D | Control Parameters for mrp | PP - Master Data | Transparent Table |
25 | T439C | Scope of Planning mrp Unit: Sequence | PP - Master Data | Transparent Table |
26 | DVER | Material Consumption for mrp Area | PP - Master Data | Transparent Table |
27 | DBPR | Material Index mrp Area for Forecast | PP - Master Data | Transparent Table |
28 | T000MD | mrp at mrp Area Level | PP - Master Data | Transparent Table |
29 | B033 | mrp Controller | SD - Conditions | Transparent Table |
30 | T438M | Control Parameter for mrp -Material Level- | PP - Master Data | Transparent Table |
31 | MDPS | Item in mrp document | PP - Master Data | Structure |
32 | MDLV | Customizing mrp Area | PP - Master Data | Transparent Table |
33 | DBPRON | Reproc. of Forecast Errors and Excpn Messages with mrp Area | MM - Consumption-Based Planning (See Also PP-MRP) | Transparent Table |
34 | MDIP | Material: mrp Profiles (Field Contents) | Logistics - Material Master | Transparent Table |
35 | T457T | Description of mrp elements | PP - Master Data | Pooled Table |
36 | MDSTATS | Performance statistic of mrp | PP - Master Data | Structure |
37 | T439L | Warehouse costs for mrp lot size | PP - Master Data | Transparent Table |
38 | TMW00 | mrp Default Values per Material Type | PP - Master Data | Transparent Table |
39 | T438X | mrp group text | PP - Master Data | Transparent Table |
40 | MRPA_WA | Work Area Material Master Management with mrp Area | MM - Consumption-Based Planning (See Also PP-MRP) | Structure |
41 | MRPDS_ORD_BUF_TIME_STR | mrp for DS: Structure for orders, wait and move times | SCM - Interfaces | Structure |
42 | MRPENQ | Enqueue Structure for mrp Run (Shared) | CA - Available to Promise (ATP) | Structure |
43 | MRP_MATERIAL_SUPPLY_AND_DEMAN1 | MT for MaterialSupplyAndDemandViewERPBasicDataByElementsQuer | PP - Planning Evaluation | Structure |
44 | MRP_MATERIAL_SUPPLY_AND_DEMAND | MT for MaterialSupplyAndDemandViewERPBasicDataByElementsResp | PP - Planning Evaluation | Structure |
45 | MRP_MATSUPANDDMN_IDNELQRY_SYNC | Message type | PP - Planning Evaluation | Structure |
46 | MRP_MATSUPANDDMN_IDNELRSP_SYNC | Message type | PP - Planning Evaluation | Structure |
47 | MRP_PLANT_ERPMATERIAL_REQUIRE1 | MT For PlantERPMaterialRequirementsPlanningPartyByIDQuery_sy | PP - Planning Evaluation | Structure |
48 | MRP_PLANT_ERPMATERIAL_REQUIREM | MT for PlantERPMaterialRequirementsPlanningPartyByIDResponse | PP - Planning Evaluation | Structure |
49 | MRP_COMPONENT_COVERAGE_FILTER | Material Delay | PP - Production Planning and Control | Structure |
50 | MRP_DELAY_IN_PROCESS_FILTER | Material Delay | PP - Production Planning and Control | Structure |
51 | MRP_MATERIAL_DELAY_FILTER | Material Delay | PP - Production Planning and Control | Structure |
52 | MRP_BUFFER_RUN | Buffer Run Lock table | PP - Material Requirements Planning | Transparent Table |
53 | MRP_BUFFER_RUN03 | Buffer Run Lock table | PP - Material Requirements Planning | Transparent Table |
54 | MRPDS_ORD_BUF_TIME_EXT | mrp for DS: Structure for orders, wait and move times | SCM - Interfaces | Structure |
55 | MRP_REQ_NOTE | Requests and Notes for mrp Cockpit | PP - Material Requirements Planning | Transparent Table |
56 | MRP_PLANNED_ORDER_POPOVER | mrp Planned Order Popover | PP - Production Planning and Control | Structure |
57 | MRP_PURCH_REQ_POPOVER | mrp Purchase Requisition Popover | PP - Production Planning and Control | Structure |
58 | MRP_REQ_MRP_ELEM_KEY | mrp element key of a mrp request | PP - Material Requirements Planning | Structure |
59 | MRP_SOL_SUPPLY_DEMAND_ITEM | mrp Solution Supply Demand Item | PP - Production Planning and Control | Structure |
60 | MRP_SOL_VIEW | mrp Solution View Cache Table | PP - Production Planning and Control | Transparent Table |
61 | MRP_REQ_PROPERTIES | Properties of a mrp request | PP - Material Requirements Planning | Structure |
62 | MRP_SUP_DEM_ITEM | Supply Demand Item | PP - Production Planning and Control | Transparent Table |
63 | MRP_TIME_TILL_SHORTAGE_FILTER | Time Till Shortage Filter Values | PP - Production Planning and Control | Structure |
64 | MRP_ACC_SHORTAGE_DATA | Shortage data for ODATA and database (Accept Shortage) | PP - Material Requirements Planning | Structure |
65 | MRP_REQ_LINE | Date and Quantity Values for Change Requests | PP - Material Requirements Planning | Transparent Table |
66 | MRP_ACC_SHORTAGE | All shortages that are accepted | PP - Material Requirements Planning | Transparent Table |
67 | MRP_REQ_MATERIAL_KEY | Material key of a mrp request | PP - Material Requirements Planning | Structure |
68 | MRP_BUFF_S_UPDATE_KEY | Key data of buffer update | PP - Material Requirements Planning | Structure |
Done.