sap固定资产号码范围_SAP 月末结帐及年末结帐步骤

a6583ec8a31d0ae16490953dc65776f1.png

作者:SAP剑客|编辑 SAP天涯

以下处理步骤包括 SD,MM,PP,FI,CO:

SD 相关步骤:  
1.检查所有到期出货清单的发货  VL06G   (Could set background jobs to automatically generate the billing due list for posting)
2.Check if all picking in due list have been processed VL06P
3.Check if all goods issue in due list have been processed VL04
4.Check if all billed AR has been release to accounting VFX3 PP 相关步骤:
1.Check if all back flash error has been solved    (COGI Check every day this kind of problem and solved on time) 2.Check if all production orders that will not be followed have been finally confirmed or    technically closed. Do final confirmation even small quantity variance exist but we consider this order has finished<
  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值