Advanced Returns Management Function like Chicken Ribs in SAP MM External Procurement Process

Advanced Returns Management Function like Chicken Ribs in SAP MM External Procurement Process

The configuration screen and document screen in this blog are based on SAP S4/HANA 1909 system.

Part I: Advanced Returns Management function in external purchase order

This section briefly introduces the SAP advanced returns management function in external purchase process.

1, The configuration of PO type NB2.

2, The setting of delivery type.

3, BP master data setting.

We need to create the customer code for the vendor in BP transaction.

 

Select the checkbox Returns Supplier in vendor master data purchasing view. See below screen,

4,Create a NB2 type purchase order.

5, VL10B to create an outbound delivery document for this PO.

6, VL02N to pick and post goods issue for the outbound delivery.

7, We can see the Returns tab in purchase order document.

Part II: Return process when ARM (Advanced return management) function is not enabled in external purchase order

This section briefly introduces the return to vendor process when the ARM (Advanced return management) function is not activated in the external purchase order. In this process, we can also create an outbound delivery document for the return purchase order, and then issue the goods to the supplier based on the outbound delivery document.

1,The setting for the purchase order type NB.

Do not select the checkbox AdvReturns.

2, The delivery type setting.

3, BP master data setting.

Select the check box Returns Supplier in vendor master data purchasing view,

4,Create a NB type purchase order document.

At this moment, we need to select the checkbox Returns item by manually.

The we execute the transaction code VL10B to create outbound delivery, and VL02N to do PGI for this outbound delivery.

There is no Returns Tab in PO header or item details.

It can be seen that without activating the ARM (Advanced returns management) function, we can also create outbound delivery documents for return purchase orders, then pick and post goods issue for this outbound delivery. This is the common practice of many SAP projects.

Of course, it can be simpler in SAP project practice. After creating a return purchase order, we can directly perform goods issue posting on reference to this purchase order through transaction code MIGO.

Part III:Conclusion

I believe that the ARM function designed by SAP is actually a chicken rib, which is of little use and only adds complexity. This can also explain why the ARM functions are rarely used in SAP project practice. After all, no SAP consultant likes to complicate simple problems!

用中文总结以下内容: A number of experimental and numerical investigations have been conducted to study the MBPP stack and wavy flow field characteristics with various designs [10,11]. T. Chu et al. conducted the durability test of a 10-kW MBPP fuel cell stack containing 30 cells under dynamic driving cycles and analyzed the performance degradation mechanism [12]. X. Li et al. studied the deformation behavior of the wavy flow channels with thin metallic sheet of 316 stainless steel from both experimental and simulation aspects [13]. J. Owejan et al. designed a PEMFC stack with anode straight flow channels and cathode wavy flow channels and studied the in situ water distributions with neutron radiograph [14]. T. Tsukamoto et al. simulated a full-scale MBPP fuel cell stack of 300 cm2 active area at high current densities and used the 3D model to analyze the in-plane and through-plane parameter distributions [15]. G. Zhang et al. developed a two-fluid 3D model of PEMFC to study the multi-phase and convection effects of wave-like flow channels which are symmetric between anode and cathode sides [16]. S. Saco et al. studied the scaled up PEMFC numerically and compared straight parallel, serpentine zig-zag and straight zig-zag flow channels cell with zig-zag flow field with a transient 3D numerical model to analyze the subfreezing temperature cold start operations [18]. P. Dong et al. introduced discontinuous S-shaped and crescent ribs into flow channels based on the concept of wavy flow field for optimized design and improved energy performance [19]. I. Anyanwu et al. investigated the two-phase flow in sinusoidal channel of different geometric configurations for PEMFC and analyzed the effects of key dimensions on the droplet removal in the flow channel [20]. Y. Peng et al. simulated 5-cell stacks with commercialized flow field designs, including Ballard-like straight flow field, Honda-like wavy flow field and Toyota-like 3D mesh flow field, to investigate their thermal management performance [21]. To note, the terms such as sinusoidal, zig-zag, wave-like and Sshaped flow channels in the aforementioned literatures are similar to the so called wavy flow channels in this paper with identical channel height for the entire flow field. The through-plane constructed wavy flow channels with periodically varied channel heights are beyond the scope of this paper [22,23].
02-10
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值