广西省MedAccred _AC8121电子电缆和线束组件的审核标准 (33)

programs, and if required, the translation of customer Part Number to shop floor Part Number?YES/NO

13.22 C- Do operators demon13.21 C- Is there objective evidence that correct component part revision levels are used in shop floor instructions, Bill of Materials, and equipmentstrate understanding of the requirements as specified in shop floor instructions?YES/NO

13.23 C- Is there objective evidence of the setup being verified for each production run?YES/NO

13.24 C- If solder alloys / flux and adhesives are not specified by customer, is there evidence of which solder alloys / flux and adhesives have been used in the build?YES/NO/NA

13.25 C- Are process control methodologies used in the planning, implementation and evaluation of the manufacturing processes used to produce Cable and Wire Harness assemblies?YES/NO

Audit Note: The philosophy, implementation strategies, tools and techniques may be applied in different sequences depending on the specific company, operation, or variable under consideration to relate process control and capability to end product requirements. The key points are that manufacturing processes are under process control to ensure end product requirements are met and that process control methodologies are used to improve manufacturing processes.

13.26 C- Is there evidence of process validation for termination processes, such as open and closed barrel, and insulation displacement equipment and tooling?YES/NO

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值