What is the difference between Sprint and Iteration in Scrum and length of each Sprint?

Question:

  1. Is there a difference between Sprint and an Iteration or one can have Iterations within a Sprint or Sprint is just the terminology used instead of Iteration in Scrum? It will be helpful if someone can throw some light on this.

  2. Suppose there are 4 sprints and you have decided the first sprint will go up to 10 days is it required that other 3 sprints should have the same length of the 1st decided sprint's length??.


Answers:

All sprints are iterations but not all iterations are sprints. Iteration is a common term in iterative and incremental development (IID). Scrum is one specialized flavor of IID so it makes sense to specialize the terminology as well. It also helps brand the methodology different from other IID methodologies :)

As to the sprint length: anything goes as long as the sprint is timeboxed i.e. it is finished on the planned date and not "when it's ready". (Or alternatively, in rare occasions, the sprint is terminated prematurely to start a new sprint in case some essential boundary conditions are changed.)

It does help to have the sprints of similar durations. There's less to remember about the sprint schedule and your planning gets more accurate. I like to keep mine at 2 calendar weeks, which will resolve into 8..10 business days outside holiday seasons.


  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值