Stakeholder Management Plan

7.1.1 Stakeholder Identification
Section 13.2.3.1 of PMBOK® 6 th ed 6 presented a structured approach to identify, analyse, and engage stakeholders
that directly or indirectly impact the direction, progress, and outcome of the project based on their needs, concerns,
interests, influence, and authority. To this end, being able to recognise the right stakeholders for a particular project
is critical as their involvement primarily determines the fate of the project. For the MM Cell Project, the Team used
iteratively the tools and techniques specified in Section 13.1.2.1 (Expert Judgment) and 13.1.2.2 (Data Gathering) of
PMBOK® 6th ed 7 to produce the list of relevant stakeholders by the end of the Planning Phase. This list, is shown in
Appendix C: Table 5 and Table 6 which contain the identification information and contact details of each stakeholder,
including the nature of their expected involvement in this Project whether Primary (through Project Execution) or
Secondary (through the UNSW Strategy) and their current association with UNSW (Internal or External).
7.1.2 Stakeholder Analysis and Engagement
Some of the data analysis tools mentioned in Section 13.1.2.3 of PMBOK® 6 th ed 8 were employed to further classify
the stakeholdersidentified in the previous section. Each of the stakeholders was evaluated based on the level of Power
(impact of stakeholder to the project) and level of Interest (impact of project to the stakeholder), in relation to the
Project. The outcomes were numerically represented from 1 to 5 where 1 is the lowest rating (Very Low) and 5 is the
highest rating (Very High). A detailed definition of the different ratingsspecific for each metric is presented in Appendix
C: Table 8 .
The two metrics were then considered as the decision criteria in a Decision Matrix shown in Appendix C: Table 9 , to
identify the stakeholders’ engagement levels which were then refined and translated to the four organisational
capabilities (see Appendix C: Table 10 ) for the efficient management of stakeholders. Through this multicriteria
analysis, the Project Manager will be able to engage each stakeholder effectively during project execution and in
decision making to maximise their individual contributions and meet their specific needs. The analysis and proposed
engagement plan for each identified stakeholder is shown in Appendix C: Table 7 .
7.1.3 Stakeholder Engagement Monitoring
One of the concepts presented in Chapter 13 of PMBOK® 6 th ed 9 about developing the Stakeholder Plan is the iterative
nature of the activities involved. A routine checking of the Plan is necessary to capture changes to the stakeholder
information which could occur at any point in the Project lifecycle, even during the execution and control phase. Such
changes could have significant implications to their project goals or contributions, and thus must be re-examined to
adjust, if necessary, the management approach of the concerned stakeholders. For the MM Cell Project, the
Stakeholder Management Plan will be checked regularly and updated as often as necessary to maintain the accuracy
of the Stakeholder Register and Stakeholder Analysis and Engagement . Where applicable, other sections of the PMP
will be revised accordingly to ensure the change is integrated across the PMP. Some of the areas that could be affected
are the Stakeholders and Benefits , Communication Plan , Risks Assessment , Project Schedule and Project Cost .
The stakeholder monitoring will be scheduled fortnightly and at every milestone completion which are both in line
with the frequency of Risks Audit as part of Risk Response Control . The identification of new risks that relates to
stakeholders will be captured in this review process and also through the use of other tools described in Risk Identification . Through this constant monitoring and integration, it can promptly address new risks to manage its
overall impact to the Project. Similarly, the opportunities arising from the movements in stakeholder power and
influence will be aptly exploited to maximise the value-adding capacity of each stakeholder. Any change to the Plan
will be subject to the change management process where a change request is required.
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
东南亚位于我国倡导推进的“一带一路”海陆交汇地带,作为当今全球发展最为迅速的地区之一,近年来区域内生产总值实现了显著且稳定的增长。根据东盟主要经济体公布的最新数据,印度尼西亚2023年国内生产总值(GDP)增长5.05%;越南2023年经济增长5.05%;马来西亚2023年经济增速为3.7%;泰国2023年经济增长1.9%;新加坡2023年经济增长1.1%;柬埔寨2023年经济增速预计为5.6%。 东盟国家在“一带一路”沿线国家中的总体GDP经济规模、贸易总额与国外直接投资均为最大,因此有着举足轻重的地位和作用。当前,东盟与中国已互相成为双方最大的交易伙伴。中国-东盟贸易总额已从2013年的443亿元增长至 2023年合计超逾6.4万亿元,占中国外贸总值的15.4%。在过去20余年中,东盟国家不断在全球多变的格局里面临挑战并寻求机遇。2023东盟国家主要经济体受到国内消费、国外投资、货币政策、旅游业复苏、和大宗商品出口价企稳等方面的提振,经济显现出稳步增长态势和强韧性的潜能。 本调研报告旨在深度挖掘东南亚市场的增长潜力与发展机会,分析东南亚市场竞争态势、销售模式、客户偏好、整体市场营商环境,为国内企业出海开展业务提供客观参考意见。 本文核心内容: 市场空间:全球行业市场空间、东南亚市场发展空间。 竞争态势:全球份额,东南亚市场企业份额。 销售模式:东南亚市场销售模式、本地代理商 客户情况:东南亚本地客户及偏好分析 营商环境:东南亚营商环境分析 本文纳入的企业包括国外及印尼本土企业,以及相关上下游企业等,部分名单 QYResearch是全球知名的大型咨询公司,行业涵盖各高科技行业产业链细分市场,横跨如半导体产业链(半导体设备及零部件、半导体材料、集成电路、制造、封测、分立器件、传感器、光电器件)、光伏产业链(设备、硅料/硅片、电池片、组件、辅料支架、逆变器、电站终端)、新能源汽车产业链(动力电池及材料、电驱电控、汽车半导体/电子、整车、充电桩)、通信产业链(通信系统设备、终端设备、电子元器件、射频前端、光模块、4G/5G/6G、宽带、IoT、数字经济、AI)、先进材料产业链(金属材料、高分子材料、陶瓷材料、纳米材料等)、机械制造产业链(数控机床、工程机械、电气机械、3C自动化、工业机器人、激光、工控、无人机)、食品药品、医疗器械、农业等。邮箱:market@qyresearch.com

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值