usually:
SET CALCPARALLEL n;
where n is one less than the number of processor, so
leave one process for other calcuations.
but set this doesn't mean calculation will run parallely:
FIX ("Actual", "Final", &Cur_Yr)
AGG("Product", "Department", "Location", "Detail", "Channel");
ENDFIX
Years, Scenaro, Version is last 3 sparse dimension, since here
did not set CALCTASKDIMS, so default is use last sparse dimension:
[Wed May 23 14:35:31 2012]EssSvr64/Margin/Main/essadmin/Info(1012678)
Calculating in parallel with [4] threads
[Wed May 23 14:35:31 2012]EssSvr64/Margin/Main/essadmin/Info(1012679)
Calculation task schedule [1]
[Wed May 23 14:35:31 2012]EssSvr64/Margin/Main/essadmin/Info(1012680)
Parallelizing using [1] task dimensions.
[Wed May 23 14:40:16 2012]EssSvr64/Margin/Main/essadmin/Info(1012579)
Total Calc Elapsed Time for [test.csc] : [284.59] seconds
so here task is not paralleled since we fixed in actual->final
now if we
SET CALCTASKDIMS 4;
[Wed May 23 14:41:09 2012]EssSvr64/Margin/Main/essadmin/Info(1012678)
Calculating in parallel with [4] threads
[Wed May 23 14:41:09 2012]EssSvr64/Margin/Main/essadmin/Info(1012679)
Calculation task schedule [1]
[Wed May 23 14:41:09 2012]EssSvr64/Margin/Main/essadmin/Info(1012680)
Parallelizing using [2] task dimensions. Usage of Calculator cache caused reduction in task dimensions
[Wed May 23 14:45:51 2012]EssSvr64/Margin/Main/essadmin/Info(1012579)
Total Calc Elapsed Time for [test.csc] : [282.49] seconds
still, since we fix in actual->final, task is not paralleled.
now let's increase CALCCACHEHIG ( maximum is 200,000,000 bytes), and rebounce the essbase service to make it take effect.
and use:
SET CACHE HIGH;
[Wed May 23 14:49:14 2012]EssSvr64/Margin/Main/essadmin/Info(1012678)
Calculating in parallel with [4] threads
[Wed May 23 14:49:14 2012]EssSvr64/Margin/Main/essadmin/Info(1012679)
Calculation task schedule [133,18,4,1,1,1,1]
[Wed May 23 14:49:14 2012]EssSvr64/Margin/Main/essadmin/Info(1012680)
Parallelizing using [4] task dimensions.
[Wed May 23 14:51:29 2012]EssSvr64/Margin/Main/essadmin/Info(1012681)
Empty tasks [67,6,0,0,0,0,0]
[Wed May 23 14:51:29 2012]EssSvr64/Margin/Main/essadmin/Info(1012579)
Total Calc Elapsed Time for [test.csc] : [134.6] seconds
calculation paralleled in detail dimension.
now if change outline, make location, detail in the last 2 sparse dimension:
[Wed May 23 15:29:23 2012]EssSvr64/Margin/Main/essadmin/Info(1012678)
Calculating in parallel with [4] threads
[Wed May 23 15:29:23 2012]EssSvr64/Margin/Main/essadmin/Info(1012679)
Calculation task schedule [6517,2478,944,302,228,220,88,22,7,3,2,1]
[Wed May 23 15:29:23 2012]EssSvr64/Margin/Main/essadmin/Info(1012680)
Parallelizing using [3] task dimensions. Usage of Calculator cache caused reduction in task dimensions
[Wed May 23 15:29:25 2012]EssSvr64/Margin/Main/essadmin/Info(1012568)
Commit Blocks Interval was adjusted to be [6144] blocks
[Wed May 23 15:31:01 2012]EssSvr64/Margin/Main/essadmin/Info(1012681)
Empty tasks [5187,1662,545,139,102,85,18,2,0,0,0,0]
[Wed May 23 15:31:01 2012]EssSvr64/Margin/Main/essadmin/Info(1012579)
Total Calc Elapsed Time for [test.csc] : [98.8]
this is fastest since calculation parallel in location, detail 2 dimensions.