Purpose

在前面有一篇文章(【Planning】APO - PPM and PDS from APO)记录了如果PPM/PDS源头从APO开始,如果传至R3的planning结果将会如何.

因为手工的PPM/PDSAPO里无法决定最后发送给R3PLproduction version. 所以验证如果Originally就是从R3发给APOPV,是否会带给R3


Approach:

 

Machine generated alternative text:
Production Version: Mass Processing
Production versions
Selection Conditions
Plant
Material No
MRP Controller
Key date
Production line
Detailed ping
Rate-based pIng
Rough-Cut PIng
w
Plant Material
U017 84963128
U017 84963128
U017 84963128
U017 84963128
flUOl7 4963128
U0 17
[uorij CAPE GIRARDEAU PLANT
84963128
Task List Type
Group
w
Pr... Text
Lock
M.
P..
C..
Te... Check date
Valid ftom
Valid to
From lot size
To
lot size U...
Alt...
B...
Ap...
Detailed...
Gr...
Type
0001 test PV
No...
?08/05/2016
08/05/2016
08/01/2017
9,999CS
ZZ
1
500005491
2 Ma...
0101 BOUNTY 24/9...
No...
EXDG 07/28/2016
07/28/2016
12/31/9999
99,999,999CS
ZZ
1
RCP41O
RG
2 Ma.
0102 dummzPV
No...
ccc 08/05/2016
08/05/2016
O8/01/2O17
9,999CS
ZZ
1
50000548
1
2 Ma...
w
0002 test PV2
No...
w
ccc 08/05/2016
08/01/2016
08/01/2017
9,999 CS
ZZ
1
50000549
2
2 Ma...
w
test PV3
No...
w
?08/05/2016
08/01/2016
08/01/2017
9,999CS
ZZ
1
500005493
2 Ma...
No... w
OB ref. mater
w


  • 0102resouce可能有问题。
  • test PVvalidity from date正好与后面convert PPDS PPM->SNP PPM在同一天,有问题。


Convert to SNP PPM

Machine generated alternative text:
SNP PPM Generation
Plans for Generation
PP/DS Plan Number 2RCP41O RG0101000000000084963128U017
SNP Plan Number [4963l28梪o17桺PM梥l
Restrict the Flagged Mode Combinations By Plan Number
Flagged PP/DS Plans to 1
Control Parameters
Start of Gen. Period 05.08.20161
Bucket Size IT Day ___________
Lowest Mode Priority ____ iE7tJr !-
Consumption Calculation 2 With PP/DS campaign case Lt4  LILJ LI
Typical Order Lot Size ? Variable Output Product Consumption ftor
Maximum Number Reference to R13 Production Version
Reference to Production Versn Use
Termination in se o Several Resources with Cross-Period Lot Size? flag
You use this indicator to define whether or not the SNP PPM is to use the PP/DS PPMs R13 production version as a reference
You should only set this indicator if you are generating SNP PPMs from PP/DS PPMs that have been transferred from R13

同时要注意:这里由PPDS PPMSNP PPM时,validity date不能是同一天。。。所以R3里,可以将PVvalid from放前一点,至少一天。


然后通过procurement priority来控制test 2作为souce of supply:

<img width="576" height="232" alt="Machine generated alternative text: Planning Book: [Live] PGXXGLSNPOO3-GLOBAL 蠷P PLANNING BOOK/ UNCON WE sg a Product 84963128 84963128 84963128 84963128 84963128 84963128 84963128 I? ?t1I 慖I 4]E11 11

然后传至R3

Machine generated alternative text:&#10;Stock/Requfrements List as of 10:05 in-s&#10;Show Overview Tree L 奐  Quota Arrangement&#10;Material 63128I ]i51 BOUNTY 24/9VALUE ADD DES TCH 9OCT BAP&#10;Plant u鉯i MRP type XC Material Type FERT Unit cs H I [&#10;MRP ... MRP element data Rescheduli... E.. ReceiptjReqmt Available Qty Pr...&#10;JO8/O5/20l6 Stock O&#10;108/10/2016 PlOrd. 1000120745/Stck 20 2&#10;108/10/2016 IndReq VSF 20? 0


 

如果让test 3作为source of supply:

Machine generated alternative text:&#10;Planning Book: [Live] PGXXGLSNPOO3-GLOBAL 蠷P PLANNING BOOK/ UNCON WE&#10;I &#10;? Selection profile&#10;CC5595&#10;. ? ED_FAMCARE_SNPJ.3&#10;. ? ZFC_R3_TO_APO_DRP_MARK_01&#10;. 訨EAN1&#10;. ? ED-REORDER DATE&#10;I &#10;Start D... Start T End Da... End Tk..&#10;09.08.... 00:00:00 09.08.... 23:59:&#10;PPM/PDS De.ion Plan/PDS MTr&#10;rtestpv3 84963&#10;L J&#10;Selected Objects&#10;Product Type&#10;84963128 !N&#10;84963128 rt.!u&#10;84963128 &#10;84963128 1h!]&#10;84963128 1hu&#10;84963128 rmni&#10;84963128 1hi&#10;Location&#10;7035&#10;U001&#10;U011&#10;U017&#10;U018&#10;U019&#10;U 020&#10;Product Short I&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;BOUNTY 24/9.&#10;a&#10;w&#10;P&#10;Forecast&#10;CS&#10;CS&#10;Sales Order&#10;DistrDemand (Planned)&#10;CS&#10;CS&#10;CS&#10;DistrDemand (TLB Confirmed)&#10;In Transit Correction&#10;Dependent Demand&#10;CS&#10;CS&#10;Substitution Demand (Planned)&#10;?Total Demand UNCON&#10;CS&#10;CS&#10;DistrReceipt (Planned)&#10;DistrReceipt (TLB Confirmed)&#10;CS&#10;In Transit&#10;CS&#10;CS&#10;Production (Planned)&#10;n...A. ..-.-.... fn..S....,..Ai&#10;re&#10;Unit 05.08.20 06.08.20 07.08.20 W 32.2016 W 33.2016 W 34.2016 W 35.2016 W 36.2016 W 37.2016 W 38.2016 W 39.2016 W 41&#10;J[ ][ 41[L1W1&#10;Characterics Source Destination Location Source of Supp 282O170802O4595900OO2&#10;U017 U017 0000000000000000000000000000

然后传至R3

Machine generated alternative text:&#10;Stock/Requfrements List as of 10:39 hrs&#10;Show Overview Tree L  Quota Arrangement&#10;84963128 BOUNTY 24/9VALUE ADD DES TCH 9OCT BAP&#10;{uoiij MRP type 5 Material Type FERT Unit  i&#10;A.. Date MRP ... MRP element data ReschedulL.. E.. Receipt/Reqmt Available Qty Pr...&#10;?O/05/2016 Stock&#10;08/10/2016 lord. 1000120746/Stok&#10;08/10/2016 IndReq VSF&#10;Material&#10;Plant&#10;: ]&#10;20&#10;20?&#10;2ED

此时再做lead time scheduling:

Machine generated alternative text:&#10;Display Planned Orden Stock order&#10;Components  Components&#10;1I1ooo12o7461&#10;84963128&#10;uoi1&#10;撁sign ment&#10;Quantities&#10;Order quantity 20&#10;Dates/Times&#10;Firming _________&#10;LJrIdIIIIed Order&#10;Q Components&#10;flCapacity Dispatched&#10;Conversion Indicator&#10;Material Num&#10;Production Version&#10;Task lists&#10;Detaded planning&#10;Rate-based planning&#10;Rough-Cut Planning&#10;9,999.000&#10;! 08/01/2017?&#10;Group Counter&#10;n&#10;n&#10;LA Stock order&#10;Material&#10;Planning Plant&#10;E Standard in-house ... ??&#10;BOUNTY 24/9VALUE ADD DES TCH QOCT B4&#10;Ecr Maintain Production Version: Detad Screen&#10;Plant&#10;CAPE GIRARDEAU PLANT&#10;Master Data Detailed Scheduhng Action Control&#10;CS Scrap quantity 0&#10;Basic Dates Prod ther Dates&#10;08/10/20 ,08/09/2016?4:00:0& Availab or MRP&#10;08/05/2016 08/05/20161120.00.00l GR ssing time&#10;End&#10;Start&#10;Opening&#10;Production Version&#10;Lock&#10;From lot size&#10;Valid from&#10;慹&#10;UO 17&#10;84963128&#10;r&#10;003 U test PV3&#10;L J&#10;Not locked&#10;10.000&#10;08/01/2016?&#10;Task List Type&#10;? Master Recipe&#10;Check J&#10;08/05/2016&#10;J&#10;Other Data __________________&#10;Production Plant UO17&#10;1&#10;Storage Location&#10;Production Version&#10;BOM Explosion Numbe0&#10;搼 Assigned Change No.&#10;To lot size&#10;Valid to&#10;Group&#10;50000549&#10;w&#10;Check stat&#10;coi&#10;Bill of Material&#10;Alternative BOM&#10;Apportionment Struct&#10;Repetitive Manufacturing&#10;[1 BOM Usage&#10;Production line F&#10;[]REM allowed&#10;Other Data&#10;r coi&#10;PlanninglD F


==>所以:


when SNP PL order transfered from APO to R3, 2 possibilities:


- if PPM not inherited from R3 PV originally ==> it will pick up default PV, like 0101


- if PPM is inherited from R3 PV ==> it will just use its PPM's original R3 PV


来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/17144169/viewspace-2131822/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/17144169/viewspace-2131822/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
毕业设计,基于SpringBoot+Vue+MySQL开发的纺织品企业财务管理系统,源码+数据库+毕业论文+视频演示 在如今社会上,关于信息上面的处理,没有任何一个企业或者个人会忽视,如何让信息急速传递,并且归档储存查询,采用之前的纸张记录模式已经不符合当前使用要求了。所以,对纺织品企业财务信息管理的提升,也为了对纺织品企业财务信息进行更好的维护,纺织品企业财务管理系统的出现就变得水到渠成不可缺少。通过对纺织品企业财务管理系统的开发,不仅仅可以学以致用,让学到的知识变成成果出现,也强化了知识记忆,扩大了知识储备,是提升自我的一种很好的方法。通过具体的开发,对整个软件开发的过程熟练掌握,不论是前期的设计,还是后续的编码测试,都有了很深刻的认知。 纺织品企业财务管理系统通过MySQL数据库与Spring Boot框架进行开发,纺织品企业财务管理系统能够实现对财务人员,员工,收费信息,支出信息,薪资信息,留言信息,报销信息等信息的管理。 通过纺织品企业财务管理系统对相关信息的处理,让信息处理变的更加的系统,更加的规范,这是一个必然的结果。已经处理好的信息,不管是用来查找,还是分析,在效率上都会成倍的提高,让计算机变得更加符合生产需要,变成人们不可缺少的一种信息处理工具,实现了绿色办公,节省社会资源,为环境保护也做了力所能及的贡献。 关键字:纺织品企业财务管理系统,薪资信息,报销信息;SpringBoot
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值