With mature process, a project is executed by following defined process. The outcome of project
is less dependenton people and more on the process. The more mature the processes are, the
more predictable the results and the more controlled the project.


Level 1~5
  Initial-->Repeatable-->Defined-->Managed-->Optimizing


L2~5 is characterized by key process areas (KPAs)


Level 2 KPAs:
Requirements Management (RM)
Software project planning (SPP)
Software project tracking and oversight(SPTO)
Software subcontract management (SSM)
Software quality assurance(SQA)
Software Configuration management (SCM)


Level 3 KPAs:
Integrated software management(ISM)
Intergroup coordination(IC)
Peer reviews (PR)


Level 4 KPAs:
Quantitative process management (QPM)
Software Quality Management (SQM)


Level 5 KPAs:
Process change management (PCM)
Technology change managemnet (TCM)
Defect prevention (DP)


The project Planning Infrastructure
Process Planning
Effort estimation and scheduling
Quality Planning
Risk Managemnet
Measurement and tracking planning
The project managment plan
Configuration Manangement
Reviews
Project monitoring and control
Project closare
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值