供应链管理:B
Backward consumption days [2](反向冲减天数 [2])
carry forward days(挪前天数)
copy/merge forecast(复制/合并预测)
master schedule load options(主计划装入选项)
Batch mode planner(批模式计划员)
Bill of distribution, creating a(分配清单,创建)
Bill of Distribution window(分配清单窗口)
Creating Bills of Distribution(创建分配清单)
View bills of distribution(查看分配清单)
Viewing bills of distribution(查看分配清单)
Bill of material(物料清单)
calendar periods, in Planner Workbench(日历期间,在计划员工作台中)
example of two-level master scheduling(双层主计划的实例)
walking up and down, in Planner Workbench(上下遍历,在计划员工作台中)
Bill of material attributes(物料清单属性)
affecting planning process(影响计划流程)
BOM Item Type(BOM 项目类型)
phantom bills(虚拟件清单)
standard bills and routings(标准清单和工艺路线)
Bill of Material window(物料清单窗口)
model bills, defining(模型清单,定义)
option class bills, defining(选项类清单,定义)
Bill of Materials Parameters window, MPS explosion level(物料清单参数窗口,MPS 展开层)
Bill of resource, plan organizations(资源清单,计划组织)
Bill-to address, consume forecasts by(开单目的地地址,冲减预测依据)
Bills(清单)
definition, for two-level master scheduling(定义,用于双层主计划)
multilevel(多层)
Bills of distribution(分配清单)
planning active [2](活动计划 [2])
ranking sources of supply(对供应来源进行分级)
sourcing percentages(来源百分比)
time-phased make-buy planning(分期制造 - 采购计划)
Bills of material, changes to, engineering change planning(物料清单,更改为,工程更改计划)
Bills, standard(清单,标准)
Bucket type, display preferences, defining(时段类型,显示参数选择,定义)
Bucket types(时段类型)
Buckets(时段)
forecasting bucket types(预测时段类型)
reviewing bucketed information(复查分时段信息)
Build sequence(建立序列)
implementing planned orders as firm jobs(将计划订单作为固定任务进行实施)
implementing repetitive schedules(实施重复性计划)
Bulk items(散件)
Buy from(购买处)
Byproducts(副产品)