Abb. | Formula | Description | |
PV BCWS |
Planned Value or Budget Cost of Work Scheduled |
计划产出 The authorized budget assigned to the scheduled work to be accomplished for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work scheduled (BCWS).P472)
|
|
EV BCWP |
Earned Value or Budget Cost of Work Performed |
The value of work performed expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work performed (BCWP).(P464)
|
|
AC | Actual cost | 实际花费 Total costs actually incurred and recorded in accomplishing work performed during a given time period for a schedule activity or work breakdown structure component. Actual cost can sometimes be direct labor hours alone, direct costs alone, or all costs including indirect costs. Also referred to as the actual cost of work performed (ACWP). See also earned value management and earned value technique.(P457) |
PMP考试中净值管理计算公式 集合
最新推荐文章于 2022-05-08 22:21:35 发布
本文详述了PMP考试中关于净值管理的计算公式,涵盖了如何结合工作绩效、资源利用和时间进度来评估项目状态,帮助考生理解并掌握这一关键概念。
摘要由CSDN通过智能技术生成