THEMIS—Alpha Sprint
The Link MY Class | 2301-MUSE社区-CSDN社区云 |
---|---|
The Link of Requirement of This Assignment | Teamwork——Alpha Sprint-CSDN社区 |
Team Name | THEMIS |
The Aim of This Assignment | Alpha Sprint–Implement campus rental platform |
Other Reference Documents |
Content
1. Code specification and plan elaboration 🍂🍂🍂
Code specification
plan elaboration
- The front end completes the overall framework construction, basic
pages and basic functions of each plate - The back-end realizes the overall framework construction and the
interface required for functions - Test the basic functions of each plate
Arrangement
Student Number | Name | To Do |
---|---|---|
832101125 | Jie Huang | Project planning/back end interaction implementation/software testing |
832101128 | Daming Fu | back end interaction implementation/software testing |
832101109 | Hongming Chen | back end interaction implementation/software testing |
832101108 | Jiayi Lu | back end interaction implementation/software testing |
832101229 | Lin Bao | front end implementation |
832101123 | Minghao Gao | front end implementation/software testing |
832101220 | Siqi Lin | product manager |
832101121 | Weijie Hong | front end implementation |
832101116 | Wenxuan Zhou | back end interaction implementation |
832101211 | Xinyun Li | blog+PPT |
832101104 | Yuxiang Su | front end implementation |
832101127 | Yuxin Peng | front end implementation |
832101207 | Yuyang Hua | blog+PPT |
832101217 | Zhaoqing Lin | blog+PPT |
2. Schedule and arrangement
---------------------------------------------Project Burnout Diagram 😤😤😤-----------------------------------
3. Test notes😶✔
- Day1 & Day2
Establish the basic project framework
Create basic components and layouts - Day3 & Day4
Based on UI design, attempt to optimize main pages and interaction
Determine the logic navigator and applications, usage flowchart, etc - Day5 & Day6
Interface coding & Develop backend logic
Implement server-side functionality for the Campus Rental Mini Program - Day7 & Day8
Testing and Debugging
Conduct unit testing
Perform integration testing
Debug and fix issues - Day9 & Day10
Optimize and finalize the code
Prepare for deployment
Deploy the Campus Rental Mini Program
4. Summary
Continue…