I. Introduction :
This is 1 essay on predicting everything concerning Beta Sprint.
Which course does this assignment belong to | 2301-MUSE社区-CSDN社区云 |
What are the requirements for this assignment | Teamwork——Alpha Sprint-CSDN社区 |
The goal of this assignment | Show the specific plan and division of work for beta sprint |
Other references | NULL |
Catalogue
II. This sprint is expected to achieve the goal
III. Tools that need improvement
II. This sprint is expected to achieve the goal
- Black box test the software again to determine if there are any other undiscovered errors and fix them;
- Realize profile picture display of personal home page;
- Beautify the interface.
III. Tools that need improvement
In the previous stage, the front-end was mainly developed using HbuilderX, and the back-end was mainly developed using IDEA. In order to realize that the project can be run as a small program, the front-end needs to use wechat developer tools, so that the project on hbuilder can run on wechat developer programs. To achieve more models of adaptation.
IV. Scheduling
Note:
1. As the end of the semester is approaching, we need to spare some time for the review of other disciplines. This division of work adopts the strategy of multi-task parallel, and the person in charge of the corresponding module is responsible for writing the sprint blog of the corresponding module, so as to beautify the interface and improve the functions of THEMIS rental platform as far as possible in a short time.
2. Due to the division of labor according to technical personnel, the specific list of personnel can see the details of the division of labor in Alpha sprint. Link as follows:THEMIS-Team's code standards, sprint task and plans.-CSDN社区
Blogging Plan
TIME | BLOG | PERSON(S) IN CHARGE |
---|---|---|
12.4 | Alpha phase problem summary | All crew |
12.4 | Prediction essay | Jie Huang |
12.4 | The essay concerning code standards | Jie Huang |
12.5-12.7 | Sprint Essay 1 | Alpha Front-end developer+UI |
12.5-12.7 | Sprint Essay 2 | Alpha Back-end developer |
12.9-12.10 | Sprint Essay 3 | All crew |
12.14 | User usage survey report | All crew |
12.14 | Beta Sprint summary | All crew |
12.14 | Defense ppt, review form | UI |
Sprint Time Plan
Day | Task Arrangement |
---|---|
Day 1 | Summarize the problems encountered in the previous stage and write the blog material before the sprint |
Day 2 | All team members use black box testing to test client functions and identify potential problems |
Day 3 - Day 5 | Complete front-end module optimization |
Day 3 - Day 5 | Complete the optimization of the back-end module |
Day 6 | Handle unexpected development issues (if not, start making and publishing application questionnaires in advance) |
Day 7 | Release application questionnaire |
Day 8 - Day 9 | Integrate the information of application questionnaire and make corresponding adjustments to users |
Day 10 | Complete user survey report information summary, Beta summary essay, defense PPT |