120. Triangle
Given a triangle, find the minimum path sum from top to bottom. Each step you may move to adjacent numbers on the row below.
For example, given the following triangle
[
[2],
[3,4],
[6,5,7],
[4,1,8,3]
]
The minimum path sum from top to bottom is 11
(i.e., 2 + 3 + 5 + 1 = 11).
动态规划,采用自底向上的更新方法,若是从上往下则麻烦很多,每一层的路径数可达2^n多。
int minimumTotal(int** triangle, int triangleSize, int* triangleColSize){
if (triangleSize == 0) return 0;
if (triangleSize == 1) return triangle[0][0];
for (int i = triangleSize - 2; i >= 0; i--)
for (int j = 0; j < triangleColSize[i]; j++)
triangle[i][j] = triangle[i][j] + fmin(triangle[i+1][j], triangle[i+1][j+1]);
return triangle[0][0];
}