Earthworks

(ppt我下不下来了,我怀疑是minerva自己的问题,所以这个课只有一半)

Background of Earthworks

the operations connected with excavations and embankments of earth

  • all civil engineering projects are associated with some form of
    earthmoving;
  • this includes removal of soil or rocks to form foundations, handing
    of spoils or importing these to site to build embankments(堤坝);
  • historically, these were treated as preliminary works hence approach
    was by trial and error;
  • failures during and after construction require careful consideration
    of earthworks;
  • advances in soil mechanics(土力学), material science(材料科学) and mechanisation(机械化) provide the basis to manage these;
  • this lecture focuses on the construction and technology aspects;

What is involved in Earthworks

  • earthworks and preliminary considerations depend on the
    scope–building, road,dam(筑坝);
  • in road works, drainage(排水) may be considered as part of earthworks
  • earthworks in relation to dams include slope stabilization(边坡加固) and
    remediation(修复);
  • irrespective of the scope, the ability to model the job in terms of
    soil properties and select the appropriate construction method is
    essential(根据土壤性质建造模型,选择适当的建造方法);

Earthworks for building

in building construction, earthworks involve:
remove topsoil—>setting out(测定)—>excavation & compaction(压实)—>shoring(支撑设备)—>backfilling(回填) around foundation(地基):
在这里插入图片描述

  • plan for quantities, program, resources, regulatory framework(规章制度) etc;

Earthworks for civil

in civil–road and rail context, earthworks involve:
setting out—>remove topsoil—>cuts and fills to foundation levels—>subgrade(路基) preparation & drainage(排水)—>lay subbase(底基层);
在这里插入图片描述
plan for quantities, program, resources including plant, materials & disposal, regulatory framework;

Planning for earthwork–design & construcyion

the design objectives are safety and economical solution which are achieved by:

  • minimal in-service settlement(在职结算);

  • to optimize(优化) cuts and fills, to minimize cost of borrowing and
    disposing spoils;

  • improve and reuse existing materials wher suitable;

  • contractors executes earthworks to specifications(按照要求,技术规范执行) e.g.method based(基于方法) or end-product based(基于最终产物);

  • method based specs tend to be prescriptive in terms of materials and
    equipment(基于方法的规范通常对材料和设备有规范要求);
    example:
    在这里插入图片描述

  • on the other hand, end-product approach definies the characteristics of the earthworks e.g. density, airvoids, moisture content of the fill materials etc;

  • contractors has flexibility(灵活性) in materials and methods which can be used to achieve the specifications;

  • flexibility makes it attractive to contractors but can be risky;

  • consequently resident engineers(常驻工程师) have challenging task to verify conformity to be specifications;

Earthwork–machinery

there are 4 categories of machinery involved in earthworks namely:

  • excavators and loaders(挖掘机,装载机);
  • earth transportation(运输);
  • bulldozers and graders(推土机,平地机);
  • compactors(压土机);
    within each category, variations exist in terms of capacity and manufacturer(制造商);

Excavators & loaders

  • excavators have capability to scoop or scrape(刮) soil, rock or loose
    materials;
  • may be further classified in terms of support(支架), boom(吊杆), depth of dig,
    capacity;
  • common type include:
    • backacters(反铲挖掘机);
    • draglines(拉铲挖掘机);
    • loading shovel(推土机)
    • backhoe(反铲装载机)
      在这里插入图片描述
      在这里插入图片描述

Transporters

  • mass haul diagrams(质量运输图) tend to be used in planning the
    transportation of materials to or off-site;
  • usually, the excavated materials are used on other parts of the
    construction;
  • consideration must be given to the ground conditions, capacity and
    access conditions etc;
    在这里插入图片描述

在这里插入图片描述

Bulldozers and graders

  • dozers can be crawler(履带) or wheel-mounted(轮式);
  • similar functions(类似功能) between dozers and graders including–trim
    excavations, spread or push spoils:
    在这里插入图片描述

compactors

在这里插入图片描述

  • soil is a porous(多孔的) material, it gets aerated(充气的) once disturbed
    and swells(膨胀) when exposed to moisture-bulking;
  • adequate compaction is necessary before subsequent work(后续工作) on the
    sub-grade(路基);
  • compaction method is specified(规定) in relation to the soil type(土壤种类)
    & moisture content(含水量);
  • the roller(滚筒) can be static or vibratory while the finish(表面) can be
    smooth or sheepfoot;

附加练习,我没看:
在这里插入图片描述
在这里插入图片描述
在这里插入图片描述
在这里插入图片描述
在这里插入图片描述
在这里插入图片描述

ppt下不了,视频也不发完!

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。
经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。 经导师精心指导并认可、获 98 分的毕业设计项目!【项目资源】:微信小程序。【项目说明】:聚焦计算机相关专业毕设及实战操练,可作课程设计与期末大作业,含全部源码,能直用于毕设,经严格调试,运行有保障!【项目服务】:有任何使用上的问题,欢迎随时与博主沟通,博主会及时解答。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值