Challenges in Lean model

Release date becomes around the corner, each stakeholders in our project sat together to discuss the challenges we encountered during the development and the factors which affect our efficiency, productivity and quality. Recalled back, we learned a lot from the experience.
 
First, from developer perspective the biggest challenges are
  1. Requirement is not as clear as before, sometimes it is only a piece of sentence.
    • Different from waterfall model, it is costly if there are many documents to maintenance. So communication is the key to make this model work. But not everybody feel flexible with communication
  2. Requirement is changing.
    • The most valuable feature of Lean model is to adapt with change. Apparently, that brings challenge to developer to change its code based on the previous design.
  3. Dependency is locked.
    • Mostly, one project is developed with the different teams simultaneously. Because each features even each functions are related. So each scrum team has to work together with others. But it is very limited when feature design is changed, which will effect to others as well.
    • Some features on the top of others, if thoes are not in the same team. The priority might not help in this case. Because in each team tasks' priorities are defined based on the different perspectives.
  4. Priority is set incorrectly.
    • Developer's task priority might depend on the main workflow or the key features on the overview of the product. But tester's bug's priority might relay to its story sign off crietiria. Especailly near the end of release, some regression based on sign off-ed story bugs might be high for tester, but developer might focus on its new story's development.
Second, from qa perspective:
  1. Iteration testing is costly.
  2. Testing schedule could not be determined at the start, resource estimation is hard to make.
  3. Mantenance the changes on testing is hard, regression occurs frequently, quality could not be predicted because some bugs hide others.
    • Solution, Unit test could be better, which could prevent lots of simple bugs, saving both ST and dev time.
    • Requirement change management tool should be professional, requirement and process management tool is not good/professional enough will cause changing of design is not transparent to tester, it is impossible only to depend on communication (including email, talk, meeting, conference call etc).
  4. Time is tight for testing at the sprint end.
    • Testing time should be postponed one week compared to the development, rushing test could not promise quality.
  5. Cross scrum team ST communication is not enough
    • When sprint testing is started, everyone is busy on testing and communicating to developers within scrum team, often ignore to communicate with cross scrum team testers. That will miss some integrated areas and also waste some overlapped areas.
Last, it's totally wrong if developer and qa think problems from the different perspectives. I think,
  •  
    • If members always focus on his tasks instead of product quality, lean model will fail.
    • If the team members performance still depends on D-Task hours, the number of fixing bugs, and the number of finding bugs, the lean model will fail.
    • If developer still think testing is responsed by testers, and tests still think dev is responsible for code quality, the lean will fail.
    • If communication's purpose is still to point problems instead of fixing problems, the lean model will fail.
    • If there are still some process/report which is not valuable for development at all, the lean will be hard to be successful.
    • IF THERE IS NOT ANY ABOVE IF, THE LEAN MODEL WILL SUCCEED.
1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合;、下 4载使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。 1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合;、下载 4使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。 1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合;、下载 4使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。
学校大创竞赛管理系统,学生上报项目内容,学院、教务处、评审专家评审。SpringBoot、SpringCloud、SpringSecurity、redis、Mysql、swagger、fastdfs、maven、vue、webpack.zip项目工程资源经过严格测试可直接运行成功且功能正常的情况才上传,可轻松复刻,拿到资料包后可轻松复现出一样的项目,本人系统开发经验充足(全领域),有任何使用问题欢迎随时与我联系,我会及时为您解惑,提供帮助。 【资源内容】:包含完整源码+工程文件+说明(如有)等。答辩评审平均分达到96分,放心下载使用!可轻松复现,设计报告也可借鉴此项目,该资源内项目代码都经过测试运行成功,功能ok的情况下才上传的。 【提供帮助】:有任何使用问题欢迎随时与我联系,我会及时解答解惑,提供帮助 【附带帮助】:若还需要相关开发工具、学习资料等,我会提供帮助,提供资料,鼓励学习进步 【项目价值】:可用在相关项目设计中,皆可应用在项目、毕业设计、课程设计、期末/期中/大作业、工程实训、大创等学科竞赛比赛、初期项目立项、学习/练手等方面,可借鉴此优质项目实现复刻,设计报告也可借鉴此项目,也可基于此项目来扩展开发出更多功能 下载后请首先打开README文件(如有),项目工程可直接复现复刻,如果基础还行,也可在此程序基础上进行修改,以实现其它功能。供开源学习/技术交流/学习参考,勿用于商业用途。质量优质,放心下载使用。
1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合; 4、下载使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。 1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合; 4、下载使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。 1、资源项目源码均已通过严格测试验证,保证能够正常运行; 2、项目问题、技术讨论,可以给博主私信或留言,博主看到后会第一时间与您进行沟通; 3、本项目比较适合计算机领域相关的毕业设计课题、课程作业等使用,尤其对于人工智能、计算机科学与技术等相关专业,更为适合; 4、下载使用后,可先查看README.md或论文文件(如有),本项目仅用作交流学习参考,请切勿用于商业用途。 5、资源来自互联网采集,如有侵权,私聊博主删除。 6、可私信博主看论文后选择购买源代码。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >