so enter----------->Book--------------->after book the line status should be waiting for shipping, if the line status still booked, we need check if the schedule data is filled, then run process order--------------->pick release------------------>load and drop in telnet (during the load, we must in put the LPN, during the drop, there is no need input the lpn, once we input the LPN, after drop successful, the system will automatcially generated a transaction type Container Pack)----------->ship confirm
mmt transaction
Sales Order Pick--------------->Container Pack(showed there once you input the drop lpn, or you had packed other items together)--------------->Sales order issue
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/15225049/viewspace-743450/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/15225049/viewspace-743450/