Cost Component Group

We use OKTZ to define cost components and define cost component group. What’s the use of cost component group? Let me explain.

Suppose we have defined a cost component as Z9 with the following components:

clip_image002

Please note that cost component from 10 to 90 are materials, from 100 to 120 are processing costs, 130 are overhead. If we’d like to view the cost component as: Material / Processing / Overhead. We can use cost component Group.

Double-click Cost Component Groups folder in the left pane. Define four groups as:

clip_image004

And then assign the above cost components in Z9 to these groups

You can select each of the above cost component and then click on Details button.

clip_image006

The overall assignment is:

clip_image008

After the definition, when you have run a cost estimate for certain material, you can use CK13N and select component group layout to view the result

clip_image002[7]

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值