oracle md030,Oracle AIM

Oracle’s Application Implementation Methodology (AIM) is Oracle\'s project management methodology and implementation strategy.

AIM provides documentation templates that support the tasks that must be performed to assist the implementation participants in running and managing projects successfully. One typically doesn\'t use all the available templates, but pick those that will be useful to your project.

7216c0ec1013ecab66be8f7ec8ffaef6.png

The methodology and structure

The methodology used is similar to traditional software project management methodologies. There are six phases within the project, these are:

◆需求定义阶段(Definition)

◆业务分析阶段(Operations Analysis)

◆方案设计阶段(Solution Design)

◆建立系统阶段(Build)

◆系统切换阶段(Transition)

◆正式运行阶段(Production)

Oracle AIM Document Templates

1)Business Process Architecture(BP)

BP.010 Define Business and Process Strategy

BP.020 Catalog and Analyze Potential Changes

BP.030 Determine Data Gathering Requirements

BP.040 Develop Current Process Model

BP.050 Review Leading Practices

BP.060 Develop High-Level Process Vision

BP.070 Develop High-Level Process Design

BP.080 Develop Future Process Model

BP.090 Document Business Procedure

2)Business Requirements Definition(RD)

RD.010 Identify Current Financial and Operating Structure

RD.020 Conduct Current Business Baseline

RD.030 Establish Process and Mapping Summary

RD.040 Gather Business Volumes and Metrics

RD.050 Gather Business Requirements

RD.060 Determine Audit and Control Requirements

RD.070 Identify Business Availability Requirements

RD.080 Identify Reporting and Information Access Requirements

3)Business Requirements Mapping

BR.010 Analyze High-Level Gaps

BR.020 Prepare mapping environment

BR.030 Map Business requirements

BR.040 Map Business Data

BR.050 Conduct Integration Fit Analysis

BR.060 Create Information Model

BR.070 Create Reporting Fit Analysis

BR.080 Test Business Solutions

BR.090 Confirm Integrated Business Solutions

BR.100 Define Applications Setup

BR.110 Define security Profiles

4)Application and Technical Architecture(TA)

TA.010 Define Architecture Requirements and Strategy

TA.020 Identify Current Technical Architecture

TA.030 Develop Preliminary Conceptual Architecture

TA.040 Define Application Architecture

TA.050 Define System Availability Strategy

TA.060 Define Reporting and Information Access Strategy

TA.070 Revise Conceptual Architecture

TA.080 Define Application Security Architecture

TA.090 Define Application and Database Server Architecture

TA.100 Define and Propose Architecture Subsystems

TA.110 Define System Capacity Plan

TA.120 Define Platform and Network Architecture

TA.130 Define Application Deployment Plan

TA.140 Assess Performance Risks

TA.150 Define System Management Procedures

5)Module Design and Build(MD)

MD.010 Define Application Extension Strategy

MD.020 Define and estimate application extensions

MD.030 Define design standards

MD.040 Define Build Standards

MD.050 Create Application extensions functional design

MD.060 Design Database extensions

MD.070 Create Application extensions technical design

MD.080 Review functional and Technical designs

MD.090 Prepare Development environment

MD.100 Create Database extensions

MD.110 Create Application extension modules

MD.120 Create Installation routines

6)Data Conversion(CV)

CV.010 Define data conversion requirements and strategy

CV.020 Define Conversion standards

CV.030 Prepare conversion environment

CV.040 Perform conversion data mapping

CV.050 Define manual conversion procedures

CV.060 Design conversion programs

CV.070 Prepare conversion test plans

CV.080 Develop conversion programs

CV.090 Perform conversion unit tests

CV.100 Perform conversion business objects

CV.110 Perform conversion validation tests

CV.120 Install conversion programs

CV.130 Convert and verify data

7)Documentation(DO)

DO.010 Define documentation requirements and strategy

DO.020 Define Documentation standards and procedures

DO.030 Prepare glossary

DO.040 Prepare documentation environment

DO.050 Produce documentation prototypes and templates

DO.060 Publish user reference manual

DO.070 Publish user guide

DO.080 Publish technical reference manual

DO.090 Publish system management guide

8)Business System Testing(TE)

TE.010 Define testing requirements and strategy

TE.020 Develop unit test script

TE.030 Develop link test script

TE.040 Develop system test script

TE.050 Develop systems integration test script

TE.060 Prepare testing environments

TE.070 Perform unit test

TE.080 Perform link test

TE.090 perform installation test

TE.100 Prepare key users for testing

TE.110 Perform system test

TE.120 Perform systems integration test

TE.130 Perform Acceptance test

9)PERFORMACE TESTING(PT)

PT.010 - Define Performance Testing Strategy

PT.020 - Identify Performance Test Scenarios

PT.030 - Identify Performance Test Transaction

PT.040 - Create Performance Test Scripts

PT.050 - Design Performance Test Transaction Programs

PT.060 - Design Performance Test Data

PT.070 - Design Test Database Load Programs

PT.080 - Create Performance Test Transaction Programs

PT.090 - Create Test Database Load Programs

PT.100 - Construct Performance Test Database

PT.110 - Prepare Performance Test Environment

PT.120 - Execute Performance Test

10)Adoption and Learning(AP)

AP.010 - Define Executive Project Strategy

AP.020 - Conduct Initial Project Team Orientation

AP.030 - Develop Project Team Learning Plan

AP.040 - Prepare Project Team Learning Environment

AP.050 - Conduct Project Team Learning Events

AP.060 - Develop Business Unit Managers’ Readiness Plan

AP.070 - Develop Project Readiness Roadmap

AP.080 - Develop and Execute Communication Campaign

AP.090 - Develop Managers’ Readiness Plan

AP.100 - Identify Business Process Impact on Organization

AP.110 - Align Human Performance Support Systems

AP.120 - Align Information Technology Groups

AP.130 - Conduct User Learning Needs Analysis

AP.140 - Develop User Learning Plan

AP.150 - Develop User Learning ware

AP.160 - Prepare User Learning Environment

AP.170 - Conduct User Learning Events

AP.180 - Conduct Effectiveness Assessment

11)Production Migration(PM)

PM.010 - Define Transition Strategy

PM.020 - Design Production Support Infrastructure

PM.030 - Develop Transition and Contingency Plan

PM.040 - Prepare Production Environment

PM.050 - Set Up Applications

PM.060 - Implement Production Support Infrastructure

PM.070 - Verify Production Readiness

PM.080 - Begin Production

PM.090 - Measure System Performance

PM.100 - Maintain System

PM.110 - Refine Production System

PM.120 - Decommission Former Systems

PM.130 - Propose Future Business DirectionPM.140 - Propose Future Technical Direction

MD050 & MD070

MD50 and MD70documents are AIM (Application ImplementationMethodology)documents for functional and Tech spec of Form andRepots customization.

MD050:This document specifies various functional specification required for Techies to understand the functional requirement of Form or Report Customization and design.. This is prepared by Functional consultant to clarify the spec to Techies. For any component like Report,Interface etc we have to first get the requirements as to what is the source ,destinations, what data should be moved and what functional validations would be required etc. All this would go into the MD050. Generally written by a non-technical people like Business Analysts or Functional Consultants.

MD050 模板:

MD070:This is technical specification prepared by the programmer based on MD50. This provides tech specs, PLSQL code for the Report and Form and helps to understand and modify if required in future. MD070 is the technical document that is written to fulfill the functional requirement specified in MD050. It includes the approaches you take, pseudo code, validations,Data Sources, SQL Statements etc.

MD070模板:

MDZIP or MDSHORT:

Many organizations combine MD50 and MD70 into a single document with a separate name like MDZIP or MDSHORT etc. The advantage of this consolidation is that the same document can be used for the functional part and later for the technical part. This is known to reduce the time for handling multiple versions of the document, approval cycles etc.

Related Doc:

Oracle ERP数据转换论:

  • 0
    点赞
  • 2
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
What is a methodology.. "A methodology is a set of guidelines or principles that can be tailored and applied to a specific situation." In a project environment, these guidelines might be a list of things to do. A methodology could also be a specific approach, templates, forms, and even checklists used over the project life cycle. Therefore that was the driving factor for bringing AIM's as methodology which was initially used by Oracle consulting , which is now most acceptable methodology for oracle application roll out. So then what oracle application methodology in short AIM's based out of... Multi-track methodology Technology Modernization Business Process Reengineering Oracle Application/System Development Organizational Change Project Management When it was first launched Any Guess… The first version of AIM was initially released for use by Oracle Consulting staff in October 1994. Tasks, steps and deliverables for project life cycle Templates for many deliverables AIM 2.0, a refined version of the method, was released in July 1997. Oracle introduced AIM Advantage 3.0 in September 1999. What is current version in market? Oracle has launched AIM's 3.1 version, which is also called as AIM's Advantage, which is now a consider as web-deployed tool kit for planning, executing and controlling Oracle Applications implementation projects. What is new in AIM's? In newer version couple of new enhancement has been made, they are · Support for business process change using the new Business Process Architecture process · Integration with Oracle products like Oracle Business Models and Oracle Tutor Is any cost for holding AIM's tool? Yes, as reported on Oracle site it cost you USD $2195 for per Named User(.. this may be changed..check with Oracle site) What other methods and tools are integrated with AIM 3.1? AIM 3.1 is closely integrated with Oracle's Project Management Method (PJM). AIM and PJM tasks are both reflected in the AIM Work Breakdown Structure (WBS). Oracle Business Models (OBM) Solution Value Assessment (SVA) Oracle Support Assessment (OSA) Learning Needs Assessment (LNA) Enterprise Data Management System (EDMS) Oracle Tutor How I get the AIM's software? AIM's download is only limited to OPN (Oracle Partner Network) What is software requirement for AIM's 3.1 1. Windows 2000, XP, NT 2. Adobe Acrobat Reader 6.0 or later 3. Microsoft Office 2000 or later 4. Microsoft IE 6.0 or later, or Netscape 7.0 or later What is covered in AIM's Technology Modernization This can be understood as the IT track contains tasks and steps relating to the creation and maintenance of procedures governing the hardware, systems software, toolsets, and databases. Oracle Application/System Development The Oracle Application/System Development track contains the tasks and steps relating to the development of custom or tool code to support interfaces, conversions, extensions, reports, and integration testing exercises. This track overlaps the process reengineering track with the iterative design and setup of the application modules. Business Process Reengineering The BPR track contains tasks and steps relating to process reengineering and application configuration. Prototyping is used to facilitate the design of "To Be" processes. Organizational Change The Organizational Change track contains the tasks and steps relating to culture and change readiness assessment, organizational and job analysis, facilities analysis and preparation, user procedures and performance based training. Project Management This track contains the tasks and steps relating to the development and management of work products on an Oracle Applications engagement. Its focus is to ensure that projects are estimated correctly, managed successfully, and properly integrated
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值