SAP PM 初级系列8 - PM 组织架构

SAP PM 初级系列8 - PM 组织架构

 

1,SAP PM模块的典型组织架构如下示:

 

 

 

2,SAP PM organizational structure includes the following organizational units(SAP PM模块组织结构包含如下的组织单元):

  • Client: Client is highest level of an organization structure. It includes all the subsidiaries within one corporate group.
  • Company Code: Each subsidiary is represented with a company code in SAP system. Each company code has its own balance sheet and P&L statement.
  • Plant: Plant is one the most important structures in SAP PM organizational structure. It is the place where manufacturing of products takes place. One company code can have multiple plants.
  • Maintenance Plant: Organizational unit where operational systems are installed is called a maintenance plant.
  • Maintenance Planning Plant: This is a plant at which the maintenance operations are planned. It is possible that requirements come from own plant or from another maintenance plant assigned to the maintenance planning plant. In most cases, the maintenance planning plant is same as the maintenance plant.

 

 

 

Cross-Plant Maintenance

 

  • Plant section: A maintenance plant can be divided into subparts which are known as plant sections. For example, a plant can be divided into production area, store, electrical substation, etc.
  • Location: Location is the place where a functional object is physically installed in a plant section. It is used for informative purposes.
  • Maintenance Planner Group: It is a group of employees responsible for planning and processing of maintenance tasks in a plant. A different maintenance planner group is created for each plant.
  • Work Center: Work center is an organizational unit where maintenance activities are performed. It belongs to master data. Work center defines where and when the maintenance operation will be performed. Work center is assigned in task list, maintenance order, and maintenance operation line items. Machine/group of machine or person/group of people can be represented as a work center.

 

 

3,A work center is used for different purposes as follows(工作中心有如下用处):

  • Costing: There is link between a cost center and a work center. Costs can be calculated if a work center is assigned in a maintenance operation because the link to the cost center provides the activity type. In activity type, the rates are maintained on a variable basis or as fixed rates.
  • Scheduling: Scheduling is used determine start and end dates of maintenance operations based on a predecessor or successor operation. During scheduling, the start date and end date are calculated based on formulas maintained in the work center.
  • Capacity Planning: The formulas related to capacity planning are stored in the work center. In capacity requirement planning, the required capacity for operation is determined from the available capacity in the work center.

 

 

 

--

 

2021-2-2 整理于长三角某市。

 

 

 

  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值