According to the maintenance requirements, in order to ensure the long-term, stable, efficient and safe operation of the Honeywell DCS system, the maintenance plan of Qingdao Haitian Weiye Automation Control System Co., Ltd. is as follows:


1、 Preparation work
To ensure that the system maintenance can proceed smoothly, Qingdao Haitian Weiye Automation Control System Co., Ltd. dispatched on-site service engineers who have received system training and experience to arrive at the site one day in advance to prepare for parking. Specifically, it includes:
Meet with the person in charge of Party A's maintenance, and conduct safety education and entry permit procedures before maintenance. Check and record the status of each node in the system shutdown, as well as the backup status of the historical module (HM) disk. Check if the drive and drive disk used for backup are intact; Check the model and status of the HM hard drive; Create a virtual disk and initialize it; Use the backup batch command to backup the complete content of the HM hard disk to the virtual disk of the engineer station, and also to the ZIP disk to achieve dual backup; After the backup is completed, compare the content of the HM hard drive to check if the backup content is complete; Label the backup disk and hand it over to the on-site maintenance engineer for safekeeping, and explain to the on-site engineer the path and file name of the backup files made on the GUS hard drive. Carefully prepare for parking and maintenance to ensure that the maintenance can proceed smoothly without any risks.


2、 System shutdown confirmation
On the premise of ensuring that all preparatory work is done properly, maintenance personnel cooperate with on-site engineers to safely cut off the power supply of the system step by step according to the characteristics and requirements of on-site production arrangements and control systems, and make corresponding records.


3、 System dust removal
1. Purpose of dust removal:
After long-term operation, the DCS system may accumulate some dust due to environmental factors such as ventilation, static electricity, temperature, and humidity in the control room. The hazards of dust to the system include the following:
- Causing a system short circuit
Generate static electricity and damage electronic components
- Causing overheating of some card components in the system, causing circuit burnout and chip burnout
Corrosion of circuits and components


2. Dust removal tools:
Brush
Vacuum cleaner
Hair dryer
Cotton cloth
Alcohol
Combination tools
- Anti static bracelet
Golden Finger Cleaning Agent
Circuit board cleaning agent
Instrument air


3. Dust removal environment:
The system dust removal needs to be carried out in the state of power outage at each node of the system.


4. Dust removal steps:
Remove the dust removal object while ensuring there is no static electricity
Preliminary treatment of dust removal objects using a hair dryer or instrument air
Disassemble and remove dust from power supplies and fans with high dust content
Thoroughly remove surface dust with a brush
Clean with circuit board cleaning agent
Clean the gold fingers of the board with a dedicated electronic cleaning agent
Clean the card box with a vacuum cleaner, hair dryer, and cotton cloth
Install the cleaned card into the card box
Dust removal and cleaning of operation stations and cabinets

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 1
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值