本文讨论了I/O系统(如S100I/O、S400I/O和S800I/O)中的板/单元/模块结构,以及DCS系统的接地方法,包括利用电气接地网格、独立网络和专用网络。着重指出过去专用接地网络的局限性,并提及实际案例中转向电气接地的改进效果。
摘要由CSDN通过智能技术生成

每个板/单元/模块通常由aGDWDEDVHHOHPHHW表示。这同样适用于板/单元/模块的各个通道。对于S100 I/O中的数字输入板,有一个高级DI板元件和32个数字输入(通道)元件。对于S400 I/O单元或S800 I/O模块,存在定义该单元(AX单元、DX单元)或模块的相应上级元素。比较不同的I/O系统S100 I/O、S400 I/O和S800 I/O,各个通道元件几乎相同。上级元素由用户/配置器创建。因此,相关的各个频道元素会自动出现。下面列出的一些板类型有一个或多个3&HOHPHQWVa应用程序接口。

DCS system grounding method
(1) Utilize the electrical grounding grid as the DCS grounding grid, i.e. share grounding with the electrical grounding grid;
(2) Establish a dedicated and independent grounding network for the DCS system;
(3) Establish a dedicated grounding network for DCS, which is connected to the electrical grounding network through a grounding wire;


Due to the many similarities between the third grounding method and the second grounding method, in the past, computer or DCS systems have often used dedicated grounding grids. However, the drawbacks of this grounding method are: large land area, high investment, high consumption of cables and grounding network steel, considerable distance from the factory building (as it is difficult to find a suitable location within the factory building), inconvenient management, maintenance, measurement, and searching for grounding electrodes and wires, and poor effectiveness.

According to actual operation, setting up a dedicated DCS grounding network is both difficult and unsafe. For example, a certain power plant has experienced dozens of unit trips due to grounding issues. According to the investigation, many power plant DCS later switched to electrical grounding grids for grounding, achieving good results.

评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值