PMP全真模拟题

提供PMP全真模拟题的汇总及详细解析,结合最新版PMBOK指南,深入剖析项目管理关键知识点,免费分享相关资料。
摘要由CSDN通过智能技术生成
Which analysis technique is used to determine the basic underlying reason for a variance,defect or risk?
A. Root cause analysis   B. Schedule baseline analysis   C. Cost variance analysis  D.Problem analysis
若要确定偏差、缺陷或风险的基本潜在原因,应使用下列哪一项分析技术?
A.根本原因分析    
B.进度基准分析   
C. 成本偏差分析     
D.问题分析
Understanding the Halo effect is very important, because there is such kind of tendency:
A. The interior promotion
B. Hires the best
C. Promotes those who excel at respective area of technology to be project managers
D . Promotes those who have had project management training experience to be projectmanagers
了解光环效应非常重要,因为有这样一种趋势:
A.内部提拔
B.聘用最优秀的
C. 提拔那些在某技术领域优秀的人作为项目经理
D.提拔那些受过项目管理培训的人作为项目经理
At what point during the project would the project manager review control measures?
A. In the planning stage           B. In the initiation and execution stages
C. Continually during the project    D. During project closure stage
在项日的什么时间点,项日经理将会审查控制措施?
A.在计划编制阶段 
B.在启动和执行阶段 
C. 在项目过程中持续审查 
D.在项目收尾阶段
When a project manager approaches the end of their company's big project, the company's organizational structure,objective and Strategies have changed. What should the projectmanager take from the following methods?
A. Speak with the line one manager to ensure the whole resources should continue to completethe task which assigned before.
B. Check if there is budget available to continue the project following the master schedule.C. Disregard the change in goals and strategies and continue to run the end.
D. Inquire with the project sponsor as to whether or not the project still fits the company'sStrategies.
在项目经理快要结束公司的大型项目时,公司的组织结构、目标和战略发生变化。项目经理必须采取下列哪一项措施?
A、与一线经理谈话保证所有资源能够继续完成之前分派的任务。
B.检查预算是否足以让项目总进度表执行。
C.忽视在目标和战略方面发生的变化、继续运行项目,直至项目结束。
D.询问项目发起人,看项目是否符合公司的战略。
The main focus of life cycle costing is to :
A. estimate installation costs.
B. estimate the cost of operations and maintenance.
C.consider installation costs when planning the project costs.
D.consider operations and maintenance costs in making project decisions.
生命周期成本法的重点是:
A.估算安装成本。
B.估算营运和维护成本。
C.规划项目成本时,考虑安装成本。
D.作出项目决策时,考虑营运和维护成本。
During project executing, one of the electrical engineers informs the project manager that thelife cycle cost of the new heating and air conditioning system is higher than the life cycle cost ofanother heating and air condition system. What should the project manager do?
A. Determine if there is room in the project budget for the additional cost.
B. Select the product with the lower life cycle cost.
C. Select the product with the best life cycle cost to earned value ratio.
D.Select the product with the lowest maintenance cost to life cycle cost ratio.
项目执行过程中,一电气工程师告诉项目经理,某一新空调系统的生命周期成本比另外一空调系统的生命周期成本要高。项
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值